BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Site work and paving for a mixed-use development in San Gabriel, California. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Update:https://www.sangabrielcity.com/DocumentCenter/View/23912/ADOPTED-CIP-FY-25-26 This project will consist of adding a southbound right turn lane, an eastbound and westbound right pocket as well as widening Valley Blvd by narrowing sidewalks to 8 feet. Right-of-way acquisition is necessary to accommodate the intersection widening. The new sidewalks, ramps, and signal improvements will provide improved pedestrian safety and mobility. Project is included in City of San Gabriel Fiscal Year 2026 - 2030 Page no 45 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- update :https://www.sangabrielcity.com/DocumentCenter/View/22584/ADOPTED-CIP-FY-24-25 This project will consist of adding a southbound right turn lane, an eastbound and westbound right pocket as well as widening Valley Blvd by narrowing sidewalks to 8 feet. Right-of-way acquisition is necessary to accommodate the intersection widening. The new sidewalks, ramps, and signal improvements will provide improved pedestrian safety and mobility. Project is in City of San Gabriel capital budget FY 2024-2025 -CIP 45 ______________________________________________________________________________________________________________ This project will consist of adding a southbound right turn lane, an eastbound and westbound right pocket as well as widening Valley Blvd by narrowing sidewalks to 8 feet. Right-of-way acquisition is necessary to accommodate the intersection widening. The new sidewalks, ramps, and signal improvements will provide improved pedestrian safety and mobility for residents. This project is currently in the City of San Gabriel's FY 2022-23 Capital Improvements Program (CIP). Per the owner, as of August 28, 2024, 30% of construction plans completed. Information regarding a design team or a timeline for construction have not been provided by the owner. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available

Design

Roads / Highways

$1,210,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
538
Active Projects
252
Bidding Soon
3,855
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

Valley Blvd & S New Ave, San Gabriel, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.