BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a power facility in Montreal, Quebec. Completed plans call for the renovation of a power facility.

As an indication and without commitment from Hydro-Quebec, the order of magnitude, including the options, is: between $1,000,000 and $3,000,000 7.1.1 - Construction of substations (civil engineering, building, electrical networks) Description of the object: The work included in this document mainly includes: Architectural work: o dismantling of the 120-12 kV control building; o the dismantling of building mechanics (fire protection, plumbing, ventilation and air conditioning, electricity) present inside the control building. Civil engineering work: o dismantling of steel structures and equipment supports; o the demolition and leveling of the reinforced concrete foundations; o the dismantling of duct blocks; o restoration of the premises; o excavation of cable trenches. Electrical installation work: o dismantling of equipment in the substation yard, including rigid and flexible busbars; o pulling and connection of MALT. Control work: o dismantling of control and power cables; o the dismantling of the panels; o dismantling of existing devices; o pulling and preparing control and power cables. Period of validity of the submission: 60 days from the date of opening of tenders Information Request/Questions: Must be sent to the manager at least three working days before the deadline date and time set for the receipt of tenders Person in charge of the file: BENACEUR Saddedine Responsible contact details: Telephone: 514-840-3000 ext. 8718 (For all questions, please use the "Messages" section on the left of the page, For all technical questions, please use the DRT form Hydro-Québec does not undertake to accept any of the proposals received. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Power Plant

$2,183,835.00

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
120
Bidding Soon
1,614
All Active Projects
674
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2022

June 8, 2022

img_map_placeholder

To Be Determined, Montreal, QC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.