BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a mixed-use development in Moberly, Missouri. Completed plans call for the remodel of a educational facility; and pre-engineered storage facility.

The Project consists of a remodel of the exterior of an existing pre-engineered metal building on the Moberly Area Community College Moberly campus. Scope of work includes but is not limited to: selective demolition of exterior elements; new metal stud wall framing, associated concrete foundation modifications, and structural steel framing; minor roof work including EPDM membrane and site-built gutters and downspouts; new doors and windows; fiber cement siding and brick veneer; painting and limited interior finishes as required by modifications; exterior signage; exterior lighting and miscellaneous electrical modifications; and limited sitework as required to complete the modifications. A certified check or bank draft, payable to the order of Moberly Area Community College, negotiable U.S. Government bonds (at par value) or a satisfactory Bid Bond executed by the Bidder an an acceptable surety in an amount equal to five percent (5%) of the total Bid shall be submitted with each Bid. Attention is called to the fact that no less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. The Moberly Area Community College reserves the right to reject any or all Bids or to waive any informality in the bidding. Bids may be held by Moberly Area Community College for a period not to exceed 45 days from the date of opening of the Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$1,082,000.00

Public - City

Remodeling

Our team is requesting plans for this project.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
40
Bidding Soon
353
All Active Projects
147
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2022

November 18, 2022

img_map_placeholder

101 N College Ave, Moberly, MO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.