Published June 15, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Sarasota, Florida. Completed plans call for site work for a water / sewer project.

Q & A deadline: Apr 27, 2022 5:00:00 PM EDT Contractor shall install approximately 6,410 linear feet of 2-inch HDPE conduit via combination of horizontal directional drilling and open trenching. The conduit shall be installed in bundles through single boreholes as shown on the Site Plan and on the Conduit Runs Table. The Contractor shall install the conduit at the length required without joints and terminate at the locations shown. Site restoration shall be minimal, as described in the specifications. 1. The project consists of installing approximately 6,410 linear feet of 2-inch HDPE conduit via combination of horizontal directional drilling and open trenching. The conduit shall be installed in bundles through single boreholes as shown on the Site Plan and on the Conduit Runs Table. 2. The total linear feet of HDD/open trenching is approximately 2,165 feet. The Contractor shall install the conduit at the length required without joints and terminate at the locations shown. 4. The City shall provide the rolls of conduit and handholes to the Contractor to install. Handholes may be installed by the City Staff or the Contractor (as Alternative Bid Item A) at their discretion. The interior of the installed conduits shall be free of material and capped at both ends. 6. Ground Penetrating Radar (GPR) Utility locates have been performed in the area of the drill/trench paths and are available upon request to the City. Bid Results 22-27Js--01-01 Mobilization/Demobilization - Bellmore Enterprises - $2000 22-27Js--01-02 Horizontal Directional Drilling - Hypower Inc - $56400 22-27Js--01-02 Horizontal Directional Drilling - Bellmore Enterprises - $56400 22-27Js--01-03 Open Trench Installation - Hypower Inc - $6270 22-27Js--01-04 Final Restoration - Hypower Inc - $2000 22-27Js--01-04 Final Restoration - Bellmore Enterprises - $2000 22-27Js--01-05 Owner Controlled Allowance - Hypower Inc - $6767

Award

Water / Sewer

$60,400.00

Public - City

Site Work

3

7

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management, Final Cleaning
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Entertainment Equipment, Athletic Equipment, Exercise Equipment
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
57
Bidding Soon
1,066
All Active Projects
467
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2022

July 5, 2022

img_map_placeholder

Multiple Locations, Sarasota, FL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Horizontal Directional Drilling for Access Control

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.