BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Herriman, Utah. Completed plans call for the construction of a 93,186-square-foot, two-story above grade educational facility; and for site work for a educational facility.

For New Multi-Use School in Herriman Board of Education of Jordan School District ; that because of the specialized nature of the construction on the above named project, the need for a timely completion thereof and other related factors, that bid documents, including plans and specifications, will be given to and bids received from only those general contractors who have been prequalified by the school district to bid on this project. Jordan School District (JSD) is inviting prequalified contractors (Contractors) to submit bids for a new multi-use school located in Herriman, UT. This solicitation is Part II of the prequalification of contractors that was initiated as part of solicitation 23KP06Q . Part I has been completed and only those prequalified contractors are invited to submit bids for construction and associated site improvements of the project to which they are authorized to bid. Final Contractor selection will be based on the lowest responsive and responsible bid as submitted in Part II. The only general contractors allowed to bid on the construction of this project will be: Bud Mahas Construction, Hughes General Contractors, Westland Construction Q & A deadline: Jan 12, 2023 6:00:00 PM EST Shortlist Confirmed Contractors must respond in each and every area as specified in the bid documents, such as bonding, licensing and licensure limits, and the bid must be returned in its entirety. The Board of Education reserves the right to reject any or all bids and to waive any informality or technicality in any proposal in the best interest of the District. All questions, interpretations, or clarifications regarding this solicitation shall be submitted through Periscope Source and are subject to the deadline for submitting questions before January 12, 2023 at 4:00 PM. If any bidder detects any discrepancy, conflict, omission, or other error in these documents, they shall notify the District in writing, thru Periscope Source, and request clarification or modification of the construction documents. Clarifications, interpretations, and answers will be posted on Periscope Source and are considered addenda to the original request. JSD reserves the right to waive or modify any of the foregoing requirements when it appears to be in their best interest to do so. Nothing contained herein shall relieve any Contractor from the obligation to comply with all other documents or requirements connected with the bidding process and awarding of the contract to the satisfaction of JSD. Work must be substantially completed by July 1, 2024. A construction schedule must be approved before commencing work by JSD representatives at the pre-construction meeting. Bidders shall attach a bid bond or cashier's check, payable to the order of Jordan School District in the amount of five percent (5%) of the total bid price. Bid bonds shall be with a corporate surety licensed to transact business in Utah and is listed in the US Treasury Circular 570 of approved sureties and has an AM Best Rating A- VIII or better. Acceptable bid security shall be limited to: (a) a bid bond underwritten by a company licensed to issue bid bonds in this State and meeting the requirements listed above; or (b) a cashier's check made payable to the JSD Board of Education Bid security shall be given as a guarantee that the bidder will execute the contract if the bid is awarded him, in conformity with the contract documents. The bid bond, check or cash of the accepted bidder shall be forfeited in the event said bidder fails or refuses to enter into a contract and/or fails to furnish the additional bonds required herein. Checks submitted in lieu of bid bonds from unsuccessful bidders will be returned upon request. If submitting a certified check, it must be delivered to the JSD Purchasing Department prior to the bid due date and time. The successful bidder must present the original bid bond (if an electronic copy was submitted with the bid) before a purchase order will be issued. The certified check, cashier's check or Bid Bond attached, in the amount not less than five percent (5%) of the above bid sum, shall become the property of the OWNER in the event that the contract is not negotiated and/or the Performance and Payment Bonds delivered within ten (10) calendar days, as liquidated damages for the delay and additional expense caused thereby. Bidders must meet all current licensing requirements of the City, County and State of Utah to do the type of work required under this bid including the proper license classifications with a sufficient monetary limit as established and issued by the Division of Occupational and Professional Licensing, State Department of Commerce, as legally required by Utah Code 58-55-301. Licensing must be current and valid at the date of bid opening. Liquidated damages for a missed deadline are set at one thousand dollars ($1,000) per day for each and every calendar day past the completion date. This amount is not to be construed in any way as a penalty but as reimbursement to the District for actual expected losses suffered as a direct result of a missed deadline.

Award

Educational

$34,030,000.00

Public - City

New Construction, Site Work

331

38

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
31
Bidding Soon
510
All Active Projects
189
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2023

February 1, 2023

img_map_placeholder

4675 W 13900 S, Herriman, UT


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.