BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Chesterfield, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The project consists of the asphalt mill and overlay of Schoettler Road, including but not limited to the removal and replacement of full-depth pavement and base, curb and gutters, as well as pavement striping. The awarded Contractor shall have 60 calendar days from the date of Notice to Proceed to complete the project. The work shall be completed between June 6, 2022 and August 19, 2022. Not less than the prevailing hourly rates of wages as found by the Department of Labor and Industrial Relations of the State of Missouri, or determined by court on appeal, shall be paid to all workers performing work under this Contract. Bidders are informed that pursuant to Section 285.530, RSMo, as a condition of the award of any contract in excess of five thousand dollars ($5,000.00), the successful bidder shall, by sworn affidavit and provision of documentation, affirm its enrollment and participation in a federal work authorization program with respect to the employees working in connection to the contracted services. Successful bidders shall also sign an affidavit affirming that they do not knowingly employ any person who is an unauthorized alien in connection to the contracted services. Contractors and sub-contractors who sign a contract to work on a public works project shall provide a ten (10) hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. Each bid must be accompanied by a cashier's check or certified check, or a Bid Bond executed by the Bidder and an approved surety company and payable to the City, in an amount not less than five percent (5%) of the sum total of the base bid. The City reserves the right to reject any and all Bids, to waive informalities therein, to determine the lowest and best bid as determined in the sole discretion of the City. For additional information regarding the project, contact Steve Merk, Civil Engineer, at 636-537-4754 or smerk@chesterfield.mo.us. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$1,098,728.00

Public - City

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
42
Bidding Soon
804
All Active Projects
314
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2022

June 6, 2022

img_map_placeholder

Schoettler Rd, Chesterfield, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.