BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 11, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in Woodway, Texas. Completed plans call for the renovation of a educational facility.

As of July 11, 2022, construction is underway. No further inquiries to be accepted. *Construction Manager at Risk - Mazanec Construction Provide waste removal facilities and services as required to maintain the site in clean and orderly condition. B. If materials to be recycled or re-used on the project must be stored on-site, provide suitable and secure non-combustible containers; locate containers holding flammable material outside the structure unless otherwise approved by the authorities having jurisdiction. C. Open free-fall chutes are not permitted. Terminate closed chutes into appropriate containers with lids. *This project has been awarded and all trades have been let.

Under Construction

Educational

$8,600,000.00

Public - City

Renovation

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
87
Bidding Soon
1,588
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.