BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2022 at 8:00 PM

Updated October 24, 2023

Site work and renovation of a water / sewer project in Bennett, Colorado. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Town of Bennett has received a DOLA Grant to implement a recycled water system to deliver recycled water for irrigation use at key Town Parks. The first phase of the Recycled Water Storage and a pumping station for recycled water fill stations at the Town's Wastewater Reclamation Facility had been completed. The construction and commission of the first phase was completed in December of 2020. Phase I enabled the Town to use Category 1 treated effluent for construction water uses by providing truck fill stations at the Town WWRF. Phase I work included lining the former treatment lagoon and conversion to a recycled water storage pond. The yard piping to divert treated effluent from the WWRF to the newly lined storage pond and a recycled water pumping station consisting of a concrete manhole (wet well) and submersible pumping system pump, piping, valves, controls, electrical, and two automated and metered construction water truck fill stations and one mobile fill station were also completed with Phase I. After the first Phase was completed The Town hired MSK consulting to provide 60% Drawings for Phase 2 Recycled Water Pump Station. The Town is now ready to receive proposals for the second phase of the Recycled Water Pump Station. This phase includes installation of a recycled water pumping and treatment station at the Town's WWRF (for distribution). Phase II: The proposed Phase II Recycled Water Project will expand and enhance the Phase I project to enable the Town to deliver Category 2 recycled water to additional Town users besides construction users, and specifically irrigation users, with system framework provided. Additional users of recycled water include Town-owned parks and other irrigated community spaces as future users. Recycled water will be delivered to these sites using the planned purple pipe distribution system. Phase II is expected to include the following improvements provided by the plans dated 3/28/2022 by MSK Consulting LLC: 1. A pump house and treatment system housing building 2. Additions or modifications to the Phase I wet well as needed 3. Relocation and addition or upgrade to the electrical service and associated equipment for the current pump station site into the new treatment building. 4. All necessary system controls, instrumentation and equipment. Page 3 of 22 5. All necessary and related system valves, piping, and flow metering. Construction of the Phase II project is expected to be conducted using a Construction-Manager-at-Risk (CMAR) delivery model with a Guaranteed Maximum Price, with physical substantial completion time line goal of June 30, 2022. Question Acceptance Deadline 04/13/2022 02:00 PM EDT Questions are submitted online Yes

Post-Bid

Water / Sewer

$320,000.00

Public - City

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
69
Bidding Soon
1,151
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2022

May 19, 2022

Project location map

Multiple Locations, Bennett, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.