BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 7, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Morinville, Alberta. Contact the soliciting agency for additional information.

The intent is to start on work immediately in spring 2022, and have all work completed prior to July 29, 2022. Time is of the essence. The overall scope of this project is: to provide on-site survey for the purpose of laying out limits of construction, which are generally an off-set distance from existing paved trails on site; to provide site safety measures to protect the public during construction work; to supply the necessary equipment to access the on-site stockpile of topsoil and distribute soil to adequate depths throughout the limits of construction; to supply and install seed to the specified density and mix type; to supply and install trees as noted in detailed drawings; to supply and install pedestrian furniture as specified; to provide one year of maintenance to ensure vigorous growth of new grass, eradication of weeds and vigorous growth of planted trees. The warranty period including Construction Completion and Final Acceptance inspections are described in the municipal standards; and all work shall be completed in accordance with the Town of Morinville's Municipal Open Space Standards, in its latest edition.

Post-Bid

Fitness / Rec Centers

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
28
Bidding Soon
508
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2022

May 20, 2022

Project location map

To Be Determined, Morinville, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.