Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a mixed-use development in Tuba City, Arizona. Completed plans call for site work for a educational facility.
Contract Award Date: Jul 19, 2022 Contract Award Number: 140A2322C0007 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: DCVWSFD9RN11 Contractor Awarded Name: MORNING DEW LANDSCAPING INC Contractor Awarded Address: Flagstaff, AZ 86004-8935 USA Base and All Options Value (Total Contract Value): $989866.16 Project Title: Remove and Replace Irrigation/Sprinkler System Project Location: Tuba City Boarding School, 306 Main St, Tuba City, AZ 86045 Magnitude of Construction: $500,000 to $1,000,000 NAICS - 221310 - Water Supply and Irrigation Systems; Size Standard $30M PSC Code - Z1CA - Maintenance of Schools Project Description: All labor, supervision, parts and equipment to remove and replace the irrigation system supporting the Tuba City Boarding School football field. Contractor is required to furnish all labor, supervision, transportation, tools, and materials remove and replace the irrigation system of the Tuba City Boarding School Football Field in accordance with the statement of work. 1.00 JB Project Location: Tuba City Boarding School 306 Main St. Tuba City, AZ 86045 Period of Performance: 127 Days from Notice To Proceed Overview The requirement is for the removal and replacement of Irrigation/Sprinkler system of the Tuba City Boarding School Football Field. The work is to remove the current irrigation/sprinkler system and install a new replacement system to include leveling of the resulting field and the installation of new sod. The playing field shall be leveled to meet required codes. Project shall comply with current Bureau of Indian Affairs Design Handbook and Energy Savings Requirement. General Information: The Irrigation/Sprinkler and leveling of field Project is located on the Navajo Reservation. Tuba City Boarding School is a K-8 School, located at 306 Main Street in Tuba City, Arizona, Coconino County. Project includes ALL schematic design and construction services necessary to provide a complete, water efficient, fully functional, and operational irrigation system for the area described in the attached photos below. The project includes the demolition, removal and disposal of the old irrigation system, installation of the new irrigation system, leveling of the ground in accordance with the required codes and regulations and replacement of the sod for the entire area identified. The football field is located north of TCBS campus and is approximately 88,502 SF. The measurement includes the additional areas on the sideline and past the endzones. (See attached photo) This area shall be field verified by contractor personnel and is considered approximate. No Alcohol, drugs, or tobacco products is allowed on TCBS Campus The Contractor will be responsible for the safety of the site location which may include installation fencing and barricades as well as signage to warn employees and the public of the on-going repair/installation work. Statement of Work: o Contractor shall replace the existing Irrigation/ Sprinkler system with a new system, this is a like for like replacement. Upon completion of the installation of new irrigation system the field shall be leveled, and sod installed. o Contractor shall provide equipment specifications, equipment/shop drawings and schematics, submittals, and all other necessary work to properly size and install Irrigation/Sprinkler System and leveling of field. This includes all related calculations relating to the water pressures within the system to ensure proper 8 zone/coverage. o Contractor shall produce schematic drawings indicating locations of drainage, piping, motors, sprinkler heads, thermostats, valves, and all other pertinent parts of an Irrigation/Sprinkler System. o All Materials are to be supplied and installed by the Contractor. They shall be new and in perfect operating condition. o Manufacturer to provide 1 year equipment warranty. o Contractor shall be responsible to identify (Blue Stake) all utilities, overhead and undergroundlines, before any construction can commence. o Contractor in coordination with the school shall prepare site designated area with groundwork, of which includes excavation, and grading site in providing a clean substrate. o Contractor is responsible for cleanup after each day. Remove all debris onsite during the duration of this project. The contractor bears all responsibility and all associated or related costs with the removal and disposal of all debris from properties of the United States Government. o Contractor shall provide a copy of the manifest for the disposal of all debris to the Tuba City Boarding School Facility office for environmental records CONTRACT ADMINISTRATION GOVERNMENT All administrative questions shall be directed to the below: Matthew Lucas, Contract Specialist, 1011 Indian School Rd NW Albuquerque, NM 87104 Phone: 941-304-2333 Email: matthew.lucas@bie.edu REQUESTS FOR INFORMATION: Questions shall be submitted by the prime contractor, through email to the Point of Contact listed above. Questions are due on May 11th, 2022, at 10:00 AM EDT. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Playgrounds / Parks / Athletic Fields
$989,866.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2022
August 4, 2022
306 Main St, Tuba City, AZ
Related To This Project
Tuba City, AZ
--
Tuba City, AZ
Bid Date: Aug 15 2022
Tuba City, AZ
Bid Date: Aug 15 2022
Tuba City, AZ
Bid Date: Sep 30 2022
Tuba City, AZ
--
Tuba City, AZ
Bid Date: Apr 21 2023
Tuba City, AZ
Bid Date: Apr 15 2022
Tuba City, AZ
Bid Date: Mar 28 2022
Tuba City, AZ
Bid Date: Mar 28 2022
Tuba City, AZ
Bid Date: Feb 20 2023
Tuba City, AZ
Bid Date: May 05 2022
Tuba City, AZ
Bid Date: Dec 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.