BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 23, 2022 at 8:00 PM

Updated May 8, 2025

Site work for a residential development in Buffalo, New York. Completed plans call for site work for a residential development.

A. General: 1. The "Work" of the contract is defined in the contract documents and includes, but is not necessarily limited to, furnishing all labor, material, equipment, insurance, permits, etc. for SITE IMPROVEMENTS @ LaSALLE COURTS (BMHA Job 21-21CF) & JASPER PARRISH HOMES (BMHA Job 21-20-CF). 2. Contract Type: Separate Prime Contracts for LaSalle Courts & Jasper Parrish Sites as identified below. B. Scope of Work: 1. Site Contract (21-21-CF) includes, but is not limited to, the following work at LaSalle Courts: a. General Construction: 1) Replacement of pavement in parking lots and roadways. 2) Repair and replacement of catch basins in parking lots and roadways. 3) Cleaning of catch basins and storm lines. 4) Replacement of curbs at sidewalks and lawn areas. 5) Replacement of existing sidewalks. 6) Installation of new sidewalks. 7) Concrete slab leveling of sunken concrete walks. 8) Grinding of sidewalk tripping hazards. 9) Filling of concrete joints with self-leveling seala 2. Site Contract (21-20-CF) includes, but is not limited to, the following work at Jasper Parish Homes: a. General Construction 1) Replacement of pavement in parking lots and roadways. 2) Construction of new parking lots. 3) Repair and replacement of catch basins in parking lots and roadways. 4) Cleaning of catch basins and storm lines. 5) New catch basins, storm lines & Underground Detention system 6) Replacement of curbs at sidewalks and lawn areas. 7) Replacement of existing sidewalks. 8) Installation of new sidewalks. 9) Concrete slab leveling of sunken concrete walks. 10) Grinding of sidewalk tripping hazards. 11) Filling of concrete joints with self-leveling sealant. 12) Replacement of missing/damaged storm doors as indicated. 13) Planting of new trees and shrubs. 14) Reconstruction of existing cast-in-place concrete stairs 15) Removal of existing site lighting fixtures, controls, and associated conduit and branch circuit wiring. 16) Installation of new site lighting fixtures, controls, and associated conduit and branch circuit wiring.

Post-Bid

Residential Subdivision

$300,000.00

Public - City

Site Work

27

19

9

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
517
Active Projects
302
Bidding Soon
4,694
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2022

May 26, 2022

Project location map

Multiple Locations, Buffalo, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.