Site work and paving for a mixed-use development in Montrose, Colorado. Completed plans call for site work for a road / highway; sidewalk / parking lot; water / sewer project; for paving for a road / highway; and sidewalk / parking lot.

The Contractor shall make all measurements and determine all quantities and amounts of work done under the Contract and in accordance with the bid form. At the time measurements are made for quantity determinations, the Citys Project Manager shall be present to verify such measurements. From these quantity figures, it will be the Contractor's responsibility to prepare a monthly periodical estimate of the Work accomplished to date. This estimate shall be submitted to the Citys Project Manager on a monthly basis 1. Work performed,or materials placed outside of lines indicated in the plans or outside the scope of Work as established by the City, the plans, and the bid documents. 2. Materials wasted, used, or disposed of in a manner not called for under the Contract. 3. Rejected materials (including material rejected after it has been placed, if the rejection is due to the Contractor's failure to comply with the provisions of the Contract. 4. Hauling and disposing of rejected materials (as referenced in 3 above). 5. Materials on hand after completion of the Work. 6. Materials, labor, appurtenances, and other items incidental to the work and required to complete the work and render it operational. 7. Any other work or material when payment is contrary to any provision of the Contract. 8. Any work not included on the Bid Form unless approved through the change order process. The City reserves the right to accept or reject any or all bids, to waive irregularities and/or informalities and to disregard all non-conforming, non-responsive, unbalanced or conditional bids. The deadline for receipt of questionsfrom Biddersin regardsto this RFP is 12:00 Noon on January 9, 2023.

Post-Bid

Roads / Highways

$291,300.00

Public - City

Paving, Site Work

45

5

18

2

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
5
Bidding Soon
114
All Active Projects
39
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2023

February 10, 2023

img_map_placeholder

6700 Rd, Montrose, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.