BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Spencer, Iowa. Completed plans call for site work for a water / sewer project.

The "2022 25TH STREET & 11TH AVENUE SW SEWER EXTENSION, SPENCER, IOWA" consists of constructing: Polyvinyl chloride (PVC) sanitary sewer main ranging in size from 8" to 10"; precast concrete manholes, and PVC sewer service risers. Said improvements will be constructed along the north side of 25th Street SW between 6th Avenue SW and 11th Avenue SW and along the east side of 11th Avenue SW, north of 25th Street SW in Spencer, IA. Major items of construction and approximate quantities thereof for the "2022 25TH STREET & 11TH AVENUE SW SEWER EXTENSION, SPENCER, IOWA" are as follows: Concrete Manholes - 9 Each 8" & 10" PVC Sanitary Sewer -3,146 Ln Ft PVC Pipe Bedding - 3,146 Ln Ft Sewer Service Wye w/PVC Riser - 30 Each Work on the project shall commence upon the issuance of a Notice to Proceed. The contractor shall have 45 consecutive calendar days to complete the project. Said 45 day period shall be between August 16, 2022 and May 19, 2023. The contractor shall complete all work covered by the contract on or before the 45th calendar day following the commencement of work at the site, or May 19, 2023, whichever comes first. All work is to be done in strict compliance with the plans and specifications that have been approved by the City Council and are now on file for public examination in the City Clerk's Office.All work is to be done in strict compliance with the plans and specifications that have been approved by the City Council and are now on file for public examination in the City Clerk's Office. Each proposal/bid shall be submitted in a sealed envelope to the City Clerk on or before the time herein set for said letting. Each proposal/bid shall be made on a proposal form furnished by the Engineer for use on this project. Each proposal shall be accompanied by a cashier's check or certified check on a solvent Iowa bank or a bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond in the form prescribed in the specifications (see Chapter 26 of the current Code of Iowa) and filed in an envelope separate from the one containing the proposal, sealed, and in the amount of not less than 5 percent of the bid. The check or bid bond shall be made payable to the Treasurer, City of Spencer, Iowa. Said check may be cashed or the bid bond declared forfeited by the City as liquidated damages in the event the bidder fails or refuses to enter into a contract as required by the specifications within fifteen (15) days of the award of a contract. The Contractor shall furnish a Performance and Payment Bond (see Chapter 573 of the current Code of Iowa), in an amount equal to one hundred percent (100%) of the amount of the contract, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall protect and save harmless the CITY, and KRUSE, CATE & NELSON, P.C., Spencer, Iowa, from claims and damages of any kind caused by the construction of said improvements, and shall also guarantee the maintenance of said improvement in good repair for not less than two (2) years from the date of final acceptance of the improvement by the City Council.The Contractor shall furnish a Performance and Payment Bond (see Chapter 573 of the current Code of Iowa), in an amount equal to one hundred percent (100%) of the amount of the contract, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall protect and save harmless the CITY, and KRUSE, CATE & NELSON, P.C., Spencer, Iowa, from claims and damages of any kind caused by the construction of said improvements, and shall also guarantee the maintenance of said improvement in good repair for not less than two (2) years from the date of final acceptance of the improvement by the City Council. The City Council reserves the right to defer acceptance of any proposal for a period not to exceed thirty-one (31) days from the date for bid opening. In addition, until the award of a contract is made, the owner reserves the right to reject any or all proposals, waive technicalities, if such waiver is in the best interest of the owner and is in conformance with applicable state and local laws or regulations pertaining to the letting of construction contracts; advertise for new proposals; or proceed with the work otherwise. All such actions shall promote the owner's best interests. The Contractor shall observe the laws of the State of Iowa with reference to "Occupational Safety and Health Standards" By virtue of statutory authority, a preference will be given to products and provisions and coal produced within the state of Iowa. Payment to the Contractor for these improvements will be made in cash from such funds as are legally available for such purpose. Final payment of the five percent (5%) due the Contractor will be made not earlier than thirty days from the final acceptance of the work by the City, subject to the conditions and in accordance with the provisions of Chapters 26 and 573 of the current Iowa Code.Final payment of the five percent (5%) due the Contractor will be made not earlier than thirty days from the final acceptance of the work by the City, subject to the conditions and in accordance with the provisions of Chapters 26 and 573 of the current Iowa Code. The City of Spencer, Iowa, does not discriminate on the basis of race, color, national origin, sex, religion, age or disability in employment or the provision of services. The City of Spencer, Iowa, does not discriminate on the basis of disability in the admission or access to, or treatment or employment in, its programs or activities. The City Manager has been designated to coordinate compliance with the non-discrimination requirements contained in section 35.107 of the Department of Justice regulations. Information concerning the provisions of the American with Disabilities Act, and the rights provided thereunder, are available from the ADA coordinator.

Award

Water / Sewer

$426,931.00

Public - City

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
14
Bidding Soon
197
All Active Projects
76
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2022

May 19, 2023

img_map_placeholder

11th Ave SW & 25th St SW, Spencer, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.