Site work for a municipal facility in Wylie, Texas. Working plans call for site work for a municipal facility.

**As of July 12, 2022, bids received were rejected as they were over the budget. Project will rebid but no definite date yet.** The North Texas Municipal Water District is soliciting bids for the Upper East Fork Interceptor System Bypass Connection & Phase II Valve Improvements. Questions Due Date: Apr 29th 2022, 10:00 AM CDT The work covered by this item consists of bypass pumping operations in order to temporarily reroute sewer flows to prevent a sanitary sewage overflow (SSO) and to provide adequate and reliable sewer flow at all times during construction, while the tasked scope of work is executed. This item includes all requirements for implementing a temporary pumping system for the purpose of diverting sewage flow around any construction-related activity to an approved reintroduction point within the sanitary sewer system. The Contractor shall minimize the health, safety, and regulatory risks by taking all reasonable measures to avoid an SSO. Therefore, North Texas Municipal Water District requires the Contractor to manage the flow of wastewater in a planned and proactive manner. Suction piping location vents with HEPA filters will be required at manholes upstream and downstream of project area. It is expected that sound attenuation be used to maintain construction noise/pump noises below 70 db.

Final Planning

Municipal

$2,732,000.00

Public - State/Provincial

Site Work

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Coordination, Construction Progress Documentation, Construction Progress Schedule, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Starting and Adjusting, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Specialty Placed Concrete, Concrete Curing, Precast Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Gratings
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Multiple Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Common Work Results for Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Hooks, Lifts, Manufacturing Equipment, Machining Equipment, Sawing Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
74
Bidding Soon
3,500
All Active Projects
1,511
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Upper East Fork Interceptor System Bypass Connection and Phase II Valve Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.