BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 12, 2022 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Oregon City, Oregon. Conceptual plans call for site work for a water / sewer project.

Notice is hereby given that Water Environment Services, through its Board of County Commissioners, provide engineering services for the Clackamas Area Interceptor Improvements Project. No Proposals will be received or considered after that time. This Project is expected to take 4 years for design, permitting, and easement acquisition activities, with construction happening in a phased approach between 2026 and 2035 depending on when the capacity in the specific section is needed. The total cost for the full Project is estimated to be approximately $40 million.

Conceptual

Water / Sewer

$40,000,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
65
Bidding Soon
1,083
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2025

Project location map

Multiple Locations, Oregon City, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.