BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 1, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a museum in Baraboo, Wisconsin. Completed plans call for the renovation of a museum.

All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. In general the work consists of: replacement of six (6) existing Rooftop Units with six (6) same sized new Rooftop units. The Feld Visitor Center HVAC units are at the end of their 20+ year life cycle. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Under Construction

Museum

$169,219.00

Public - State/Provincial

Renovation

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
56
Bidding Soon
875
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2022

June 30, 2022

Project location map

550 Water St, Baraboo, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.