EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 24, 2022 at 8:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Cherry Hill, New Jersey. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The FY 2022 ADA Ramp Contract involves the installation of ADA complaint ramps including associated curb and sidewalk at various locations as illustrated on the enclosed project location maps located in the Township of Cherry Hill, Camden County, New Jersey. 1. General Notes: a. Contractor shall verify all existing conditions in the field prior to the submission of their proposal. b. Any areas and structures disturbed during construction shall be restored to the condition at least equal to that which existed prior to the start of construction. Any debris will be removed from the project at the contractor's expense. c. The contractor shall be responsible for the location and preservation of all underground and surface utilities and structures at or adjacent to the site of construction, and it shall be at his own expense to repair or replace anything he damages. d. Contractor shall notify all utility companies prior to any construction activities. No interpretations of the meaning of the drawings, specifications or other contract documents will be made to any bidder orally. Every request for such interpretation should be made in writing, addressed to the Purchasing Agent, and to be given consideration, must be received at least ten (10) days prior to the final date fixed for receiving bids. Any and all such interpretations and/or supplemental instructions will be in the form of written addenda to the specifications.

Post-Bid

Sidewalks / Parking Lot

$300,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 26 - Electrical

Division 26 - Electrical

Electrical
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Site Improvements, Retaining Walls, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
352
Active Projects
190
Bidding Soon
3,843
All Active Projects
1,647
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2022

May 26, 2022

img_map_placeholder

Multiple Locations, Cherry Hill, NJ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.