BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 26, 2022 at 8:00 PM

Updated October 24, 2023

Renovation of an educational facility in Tacoma, Washington. Completed plans call for the renovation of a educational facility.

Clover Park School District TilIleum Window Replacement Remove and replace existing original windows and replace them with new dual glazed aluminum storefronts and abate, remove and replace identified existing doors per scope of work attached. The Owner reserves the right to reject any and all bids, to waive informalities and irregularities in the bidding, and to accept bids which are considered in the best interest of the Owner. Bidders may not withdraw bids after the time set for the Bid Opening unless Award of Contract is delayed for a period exceeding 45 days. Questions Due Date: Apr 18th 2022, 5:00 PM PDT

Post-Bid

Educational

$200,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
93
Bidding Soon
1,499
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.