BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Lynnwood, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Thus Contract provides for improvement of Scriber Creek Trail Phase 2, which runs from north of 200th St SW to the south west corner of Lynnwood Transit Center. The work includes but not limited to construction of approximately 0.4 miles of 10 to 12-foot- wide paved trail with gravel shoulders, 910 feet of elevated boardwalk structure, cement concrete sidewalk, curb ramps, curb and gutter, stormwater conveyance system, concrete driveway crossings, erosion control, site preparation, grading, utility adjustments/ relocation, roadway channelization striping, pavement markings, trail ammenities, permanent signage, signal system modification at the intersection of 200th St SW/Cedar Valley RD and other electrical appurtenances including service cabinet, signal controller, electrical lines and junction boxes, ilumination system, wetland mitigation planting, traffic control, and other miscellaneous work. AIL Bids shall be based upon comphance with the Project Manual inccluding, without limtation, the Contract Plans and Specifications). The estimated cost range for this project is ($5,800,000 to $6,500,000). The project shall be Physically Completed within in 365 working days of the Notice to Proceed. All questions regarding this Project shall be addressed to Monica Thompson, Project Manager, at mthompson@lynnwoodwa.gov. The City expressly reserves the right to reject any or ail Bids, to waive irregularities, and to award the project to the lowest responsive, responsible Bidder. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$7,982,674.00

Public - City

Paving, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
49
Bidding Soon
921
All Active Projects
341
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 29, 2022

August 29, 2022

img_map_placeholder

Scriber Creek Trail, Lynnwood, WA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.