BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a civil project in Pasadena, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The work in this contract is for the Sanitary Sewer Phase 75 Rehabilitation at Honey Oaks for Clear Lake City Water Authority located at the intersection of Kirby Boulevard and Old Kirby Road, near 1200 Kirby Rd., Seabrook, TX 77586. The purpose of this project is to redirect sanitary sewer force mains to prevent high flow in the existing sanitary sewer system. The existing 6-inch force main from Lift Stations No. 20 and 21 and the existing 6-inch force main from Lift Station No. 22 will be rerouted to a proposed manhole on the west side of Kirby Boulevard. The flow from the force mains will then gravity to a proposed manhole and tie into the existing sanitary sewer system downstream. In general, this work consists of: 1. Installation of new 6-inch green AWWA C-900 PVC sanitary sewer force main by trenchless construction, including all restrained joints, bends, and fittings, to reroute the existing force main from Lift Stations No. 20 and 21. 2. Installation of new 6-inch green AWWA C-900 PVC sanitary sewer force main by trenchless construction, including all restrained joints, bends, and fittings, to reroute the existing force main Lift Station No. 22. 3. Installation of new 18-inch green SDR 26 gravity sanitary sewer pipe, including connection to existing sanitary sewer manhole. 4. Installation of a new pre-cast concrete corrosion resistant sanitary sewer manhole to serve as the discharge point for the force mains from Lift Stations No. 20, 21 and 22. 5. Installation of a new pre-cast concrete sanitary sewer manhole. 6. Reconnecting the new 6-inch sanitary sewer force main into the existing system by wet connection. 7. Cutting, capping, and abandoning of existing 6-inch sanitary sewer force main. 8. Implementation of trench safety. 9. Site restoration of disturbed areas including replacing concrete pavement, damaged or removed turf, plants, shrubs, trees, fences, and gates. 10. Implementation and maintenance of traffic control plan. Each bid shall be submitted on the prescribed form and accompanied by a bid bond, cashier's check or certified check in the amount equal to ten percent (10%) of total base bid. If certified or cashier's check is used as bid security, check must be drawn on a responsible bank located in the State of Texas and made payable to Owner only. The Owner reserves the right to waive any informalities or minor defects and to reject any or all bids. In case of the lack of clarity or ambiguity in prices, the Owner reserves the right to accept the most advantageous or reject the bid. The successful bidder will be required to provide payment and performance bonds in the amount of one hundred percent (100%) of the contract price.

Post-Bid

Water / Sewer

$143,000.00

Public - City

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
359
Active Projects
196
Bidding Soon
3,219
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2022

June 21, 2022

Project location map

Old Kirby Rd & Kirby Blvd, Pasadena, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.