BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 1, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in San Antonio, Texas. Completed plans call for the renovation of a educational facility.

The Project is generally described as follows: Flooring Replacement at John Glenn Elementary School as indicated on the drawings and specifications to include all general construction, site work, heating, air conditioning, electrical, plumbing and all other work as indicated on the construction documents.

Post-Bid

Educational

$50,000.00

Public - County

Renovation

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
63
Bidding Soon
2,164
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2022

June 2, 2022

Project location map

2385 Horal Dr, San Antonio, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.