BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Phoenix, Arizona. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

All format requirements, submittal guidelines, instructions and documentation submission contained in this RFQ Package are for the ECS Contract Number and ADOT Project Number referenced above. SOQ submittals failing to follow the format, online submittal guidelines or any other instructions outlined in this RFQ Package shall be rejected. ADOT reserves the right to reject any and all SOQs, cancel the advertisement, negotiations or contract at any time in the best interest of the State. This contract will allow for the use of Subconsultants. No administrative fee, hours or markup of Subconsultant rates will be allowed by the prime consultant or accepted by ADOT. Any firm that has submitted an SOQ as a Prime Consultant and is identified as a Subconsultant in another Prime Consultant's proposal shall have their Prime Consultant SOQ submission rejected. If a Prime Consultant lists firms as Subconsultants in its SOQ, the Prime Consultant must be able to provide ADOT with evidence, if requested, of written consent provided by the Subconsultant firms that are listed as part of their Prime Consultant's SOQ, or that Prime Consultant's SOQ will be rejected. A firm who proposed, but was not selected may be added as a subconsultant after contracts have been executed. This contract has been established as Race Conscious with a 9.68% DBE Goal. The Compensation Type for this contract will be Cost Plus Fixed Fee. The non-negotiable Fixed Fee for this contract, and any applicable extensions, has been established at 10%. Questions, in writing, shall be received by ECS until April 21, 2022 at 2:00 P.M. (Arizona Time). No further questions shall be accepted after the time specified. Questions Due: April 21, 2022 at 2:00 P.M. Arizona (Phoenix) Time SOQ Submittal Due Date: April 29, 2022 at 2:00 P.M. Arizona (Phoenix) Time Estimated Selection Date: June 06, 2022 Initial Cost Proposal Due Date: June 20, 2022 Estimated Contract Notice to Proceed Date: September 06, 2022 AZDOT - RFQ - I-19 Irvington Ti

Conceptual

Roads / Highways

$400,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
19
Bidding Soon
677
All Active Projects
269
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2023

img_map_placeholder

Multiple Locations, Phoenix, AZ

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.