Renovation of a municipal facility in Vancouver, British Columbia. Completed plans call for the renovation of a one-story above grade municipal facility.

Contractor is to install a new water-chilled cooling unit and modify the existing unit in the ceiling space of an operational server room to achieve the desired cooling capacity to prevent overheating of the servers. Work will also include the removal and reinstallation of existing water pipes and air diffusers, and the performance balancing/testing after construction is complete. Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform. Bid date has been extended from 12/05/2022 to 12/12/2022. Award is subject to final approval.

Award

Municipal

$125,933.00

Public - Federal

Renovation

6

17

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Administrative Requirements, Project Management and Coordination, Project Meetings, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Testing and Inspecting Agency Qualifications, Manufacturer?s Field Services, Quality Control, Testing Laboratory Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Maintenance Data, Warranties, Demonstration and Training, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Metal Fabrications, Metal Stairs
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Smoke Seals
Division 08 - Openings

Division 08 - Openings

Curtain Wall and Glazed Assemblies, Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Terrazzo Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Vibration and Seismic Controls for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Ducts, Duct Liners, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Instrumentation and Control for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
40
Bidding Soon
1,275
All Active Projects
415
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Server Room Review & Upgrade

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.