BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 3, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a bridge / tunnel in Holden, Massachusetts. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Location: Holden Project Type: Bridge - Construction MASSDOT - Bridge Substructure Concrete Repairs and Related Work Bridge Number H-18-029 - Pier #2 NB and SB Interstate 190 Over the Quinapoxet River 1. Removing the deteriorated concrete from any element of the substructure, including but not limited to the pier base walls, pier columns, and pier caps. 2. Replacing excavated, spalled, delaminated, or deteriorated concrete, and replacing of any broken, missing, or deteriorated reinforcing steel with new material. Bridge No. H-18-029 (I-190 NB over the Quinapoxet River): 1. In-kind replacement of the corroded structural steel end cross-bracing angles at the Pier 0. (Item 107.97). 2. Steel repairs to address section losses at end of Girder 6A, in Span 1, over Pier 0 (Item 107.97). 3. Bearings sliding plate adjustment (Items 106.893 and 960.91). 4. Repair of cracked weld between the bottom flange and bearing 5 sole plates at Pier 0 (Item 100.1 and Non-Bid items). 5. Replace sheared anchor bolt(s) at bearing over Pier 0 (Item 100.1 and Non-Bid items). 6. Drainage structures adjustment or repairs (Item 100.1 and Non-Bid items). Bridge No. H-18-029 (I-90 SB over the Quinapoxet River): 7. Drainage structures adjustment or repairs (Item 100.1). 8. Concrete repairs at the Northeast top corner of Pier #3 delamination (Item 100.1 and NonBid items) 9. Additional concrete substructure repairs including noted minor delamination, spalls and cracking in Pier 3 and Pier 4. These repairs will be scoped and required by the Engineer and will be compensated under the (Item 100.1 and Non-Bid items) provisions of the Contract P.V. = $1,244,000.00 M/WBE Participation Goal 14 % Project shall be 15.3% for minorities and 6.9% for women

Award

Bridges / Tunnels

$1,324,257.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
672
Active Projects
312
Bidding Soon
4,927
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2022

July 4, 2022

Project location map

I-190, Holden, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.