BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 14, 2022 at 8:00 PM

Updated April 9, 2024

Site work for a bridge / tunnel in Boonville, Missouri. Completed plans call for site work for a bridge / tunnel.

The replacement of the existing damaged CMP culvert with a new 16'-2" wide, 5'-1" tall, 56'-0" long bottomless Aluminum Box Culvert supported on concrete spread-footings with aluminum headwalls and wingwalls located on Walnut Drive over a Tributary to Clark Fork (Lat/Long: 38.820289, -92.664675). Submit all questions about meaning or intent of the Bidding Documents to Dustin Berry of Midwest Engineering Group, LLC by phone 660-676-8202 or email dberry@midwest-engineers.com . Terracon Project No. 15215217

Bid Results

Bridges / Tunnels

$197,936.00

Public - City

Site Work

14

10

5

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
36
Bidding Soon
465
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2022

June 12, 2022

Project location map

W Walnut St, Boonville, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.