BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Lomira, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Base Bid - Water St. from Main St. 316 ft South. The work shall consist of removing existing surface of asphalt pavement, fine grade, water and compaction of approximately 1,120 sq/yds.; Constructing 2.25" thick asphaltic binder, type 0.3 (lower layer) and 1.75" thick of hot mix asphaltic, type 0.3 (upper layer). AlternateBid -SouthAve. fromWaterSt. 71ftWest including parking at 677 Water St. The work shall consist of removing existing surface of asphalt pavement, fine grade, water and compaction of approximately 400 sq/yds.; Constructing 2.25" thick asphaltic binder, type 0.3 (lower layer) and 1.75" thick of hot mix asphaltic, type 0.3 (upper layer). Excess material will be hauled to a site designated by the Director of Public Works within the Village limits. Project may commence anytime between June 1 through October 1, with a 10-day working period to complete once started. No bid shall be received unless accompanied by a certified check or satisfactory bid bond payable to the Village of Lomira in an amount not less than 10% of the maximum bid as guarantee that, if the bid is accepted, the bidder will execute and file the contract, performance/payment bonds and insurance certification, as required by the contract documents, within ten (10) days after the Notice of Award. The OWNER reserves the right to reject any and all bids, waive any informalities in bidding or to accept the bid or bids which best serves the interests of the Village of Lomira. No bid shall be withdrawn for a period of 90 days after the scheduled opening without consent of the OWNER. The contract letting shall be subject to the provisions of Sections 66.0901, and 779.14 of the Wisconsin Statutes. Published by the authority of the Village of Lomira acting through its Village Board.

Award

Roads / Highways

$28,882.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
69
Bidding Soon
2,257
All Active Projects
697
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 27, 2022

June 27, 2022

img_map_placeholder

S Water St, Lomira, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.