BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Mountlake Terrace, Washington. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of June 01, 2022, project was awarded to Encore Environmental LLC, awarded amount is $105,640.15.** Questions or clarifications regarding this Invitation for Bid must be received by 10:00 a.m. on April 22, 2022. This project will reconstruct a failing section of the rockery on Hall Creak near 6303 213th Pl SW in Mountlake Terrace, Washington. The failing section has created a void approximately 4 feet wide and 10 feet deep, which extends approximately 10 feet horizontally under the adjacent property. This work will take place in Hall Creek, a designated critical area, and will be constructed during the permit window between July 1 and September 30, 2022 in accordance with the Hydraulic Project Approval permit. The work includes erosion and sediment control, protection of critical areas, stream diversion, fish exclusion, excavation, geotechnical stabilization, rockery repair, and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the 2022 WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal Construction. The estimated cost of construction is between $79,000 and $98,000. This project is funded by City Stormwater Utility funds. All contractors must be licensed in the State of Washington to conduct business. All work performed on this project is subject to state prevailing wage rates. Performance Bond - To be executed by successful Bidder and Surety Company. Email a copy, mail the original. Labor and Material Payment Bond - To be executed by successful Bidder and Surety Company. Email a copy, mail the original. The City retains the right to reject any and all bids and to waive informalities and minor irregularities in the bidding process.

Award

Sidewalks / Parking Lot

$105,640.00

Public - City

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
49
Bidding Soon
922
All Active Projects
342
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2022

July 1, 2022

img_map_placeholder

6303 213th Pl SW, Mountlake Terrace, WA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.