BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Penticton, British Columbia. Completed plans call for the renovation of a educational facility.

The HVAC upgrades for KVR Middle School were split into three phases of construction for funding purposes. Each Phase is considered an independent project that will be tendered separately. This following provides a description of each phase for information. Phase 1 is the only phase in this contract. Phase 1 .1 The existing boiler plant is to be removed and replaced with new high efficiency condensing high mass boilers which were pre-purchased by School district 67. The boilers are configured in a draw through configuration with isolation control valves. .2 Air handling unit heating coils to be removed and piping changed to connect chilled water coils to the heating water system. New coil pumps with variable speed capabilities are provided to facilitate system balancing and optimization. .3 The existing heat exchanger between the heating water system and the distributed heat pump loop (HVAC Loop) will be removed to simplify hydronic systems and optimize pumping power. Distributed heat pump loop pumps to be reconfigured to allow injection of heating water into the loop. .4 Piping changes have been designed to facilitate construction of Phase 2 and 3 Documents can be obtained from https://emergentmechanical.bidsandtenders.ca/

Award

Educational

$100,000.00

Public - State/Provincial

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
2
Bidding Soon
151
All Active Projects
63
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2022

June 30, 2022

img_map_placeholder

300 Jermyn Ave, Penticton, BC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.