BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 14, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Loa, Utah. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Wayne County will accept sealed bids for chip sealing approximately 10 miles of County road in the Loa, Bicknell area. The oil for the chipping will be furnished by the County. The bid will include class A chips at State specs, sweeping and preparing the road surface, laying and rolling the chips, and sweeping the road surface after laying the chips and striping of the roadway. The chipping must be completed by September 15, 2022. For additional information please contact Rhett Jeffery at 435-836-2682. Wayne County reserves the right to accept or reject any and all bids.

Post-Bid

Roads / Highways

$200,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
4
Bidding Soon
71
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2022

May 30, 2022

Project location map

To Be Determined, Loa, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.