BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a pre-engineered storage facility in Cantonment, Florida. Completed plans call for the renovation of a pre-engineered storage facility.

Hurricane Sally Repairs for Road Prison Uniform Storage Building Exterior 1. Proper staging of materials. Materials shall arrive onsite in their manufacturers labeling and be kept in a watertight/temperature safe environment prior to installation as per all manufacturers' recommendations that apply. 2. Remove one (1) aluminum framed, double hung window with screen on the Southwest corner of the structure. 3. Following the removal of the window, the rough in bucks should be removed and replaced with like kind and quality components (assumed lumber). A self-adhered membrane should then be applied to the head, sill, and jambs of the rough in for additional moisture deterrence. 4. The new replacement window (contractor to verify dimensions) should be installed per manufacturer recommendations and be of like kind and quality. Wall and Ceiling Paneling 1. Proper staging of materials. Materials shall arrive onsite in their manufacturers labeling and be kept in a watertight/temperature safe environment prior to installation as per all manufacturers' recommendations that apply. 2. Remove all light fixtures, heat/AC registers, and other buildings off from the walls and ceilings. In the restroom, the wall mounted sink, the plate glass mirror, handicap grab bar, toilet paper dispenser, soap/hand sanitizer, and paper towel dispenser will have to be removed in order to remove the wall paneling in this room. 3. Remove the faux wood paneling and fiberglass reinforced plastic from the walls throughout the structure (2,100 SF of wood paneling and 250 SF of fiberglass reinforced plastic just in the restroom). 4. Remove the gypsum wallboard on the ceilings and the walls of the restroom (approximately 850 SF overall; 600 SF on the ceilings of the offices and storage area and 250 SF of the ceiling and walls of the restroom). 5. Remove and replace 3000 SF of R-30 batt insulation found inside the walls and ceilings per manufacturer recommendations. Ensure newly installed batt insulation matches previously removed insulation in R-value and type. 6. Install new 3/8" gypsum wallboard on the ceilings and on all the walls of the restroom. Gypsum wallboard should be taped and floated. 7. Install new wall paneling on the walls throughout the building including the 250 SF of fiberglass reinforced plastic on the walls and ceiling of the restroom - trim included. 8. Apply acoustic ceiling (popcorn) texture to the ceilings where previously done avoiding overspray onto the walls. Paint all door/window trim and jambs and door slabs. Prime door slabs as needed. All painting should be done with a minimum of two (2) coats of paint to ensure proper coverage. 9. Once all new wall paneling has been installed, reinstall the previously removed building components that include all light fixtures, heat/AC registers, wall mounted sink, plate glass mirror, handicap grab bar, toilet paper dispenser, soap/hand sanitizer, and paper towel dispenser per manufacturer recommendations. VCT Flooring 1. Proper staging of materials. Materials shall arrive onsite in their manufacturers labeling and be kept in a watertight/temperature safe environment prior to installation as per all manufacturers' recommendations that apply. 2. Remove the moisture damaged VCT located in every room cautiously in an attempt to prevent damage to the lumber substrate (approximately 600 square feet). Contractor will need to remove the toilet in the restroom in order to completely remove the affected VCT in that area. 3. Any moisture damaged lumber substrate or lumber substrate damaged during VCT removal should be removed and replaced with like kind and quality material. Contactor should include a unit price for lumber. 4. Lumber substrate shall then be properly prepped and cleaned to ensure proper adhesion to new VCT. 5. New VCT should then be installed per manufacturer recommendations. 6. After VCT has properly adhered to the lumber substrate, the toilet previously removed from the restroom should be reinstalled per manufacturer recommendations. Window Blinds 1. Proper staging of materials. Materials shall arrive onsite in their manufacturers labeling and be kept in a watertight/temperature safe environment prior to installation as per all manufacturers' recommendations that apply. 2. Remove and replace eight (8) 1" PVC window blinds in the windows along the southern side of the structure. New windows blinds should match existing as best possible. Projects less than $25,000 will not require a bond.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$204,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
32
Bidding Soon
456
All Active Projects
215
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2022

June 16, 2022

img_map_placeholder

601 County Rd 297A, Cantonment, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.