Site work and paving for a mixed-use development in Saint Francis, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Approximate quantities are as follows: Inlet Protection 5 EA. \ Tree Removal and Grubbing 1 L.S. \ Full Depth Sawcut Pavement 1,950 L.F. \ Mill Asphalt Pavement 2,350 S.Y \ Remove Curb and Gutter and Concrete 1,600 L.F. \ Remove Concrete Sidewalk 4,200 S.F. \ Remove Concrete Driveway 2,400 S.F. \ Remove Terrace Concrete/Asphalt 3,320 S.F. \ Drilled Tie Bars 210 EA. \ Excavation Below Subgrade 150 C.Y. \ Storm/Sanitary Sewer Manhole Chimney Adjustment 10 EA. \ Sanitary Sewer Internal Seals 7 EA. \ Storm Catch Basin Replacement 2 EA. \ Catch Basin Adjustment 3 EA \ Base Aggregate, Dense 1 1/4 -inch 380 TON \ Asphalt Pavement (Surface) 4 LT 58-28 S 350TON \ Asphalt Pavement (Binder) 3 LT 58-28 S 100 TON \ Asphalt Pavement Terrace, 3-inch 280 S.Y. \ Concrete Curb and Gutter 1,600 L.F. \ Concrete Sidewalk, 5-inch 3,300 S.F. \ Concrete Sidewalk, 7-inch 900 S.F. \ Concrete Driveway, 7-inch 2,400 S.F. \ Concrete Terrace, 5-inch 800 S.F. \ Concrete 42 CY \ Detectable Warning Field 60 S.F. \ Topsoil, Fertilizer, Sod and Water 300 S.Y. \ Traffic Control 1 L.S. \ Dust Control 1 L.S. \ This is a unit price contract. The estimated quantities as indicated above and on the Bid Schedule are inserted only for the purpose of determining the low bidder. \ Project is to be substantially complete on, or before, September 16, 2022. \ The Contract letting shall be subject to the provisions of Sections 62.15, 66.0901. of the Wisconsin Statutes. \ All bidders must file a "Bidders Qualification Statement" with the Owner on or before 10:00 AM on Friday, April 20, 2022, unless already submitted to St. Francis for 2022. \ Bids shall be submitted on the electronic Bid Form provided through QuestCDN. All blanks must be filled in for the bid to be accepted. No bid may be withdrawn for a period of 60 days from the date of the bid opening. Failure to list subcontractors or suppliers may be cause for rejection of the Bid. \ Bids shall be accompanied by Bid Security in the form of a Bid Bond, certified check, or cashier's check made payable to the Owner in an amount of 5 percent of the Bidder's maximum Bid price. If the successful bidder fails to execute the contract and furnish the required bonds within 10 days after the Award, the Bid Security shall be forfeited to Owner as liquidated damages. \ Owner reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work and the right to disregard all nonconforming, non-responsive, unbalanced or conditional Bids and the right to accept the Bid or Bids which best serve the interests of the Owner, subject to the provisions of Wisconsin Statutes, Sections 62.15 and 66.0901. \ Bidder awarded a contract for the work shall be required to furnish a Performance Bond and a Payment Bond in the full amount of the contract price. Prime Contractor(s) shall furnish listing of all subcontractors and suppliers performing labor and supplying materials under the Contract that individually have a total value of $1,000 or more. \ Plans and specifications for this project were prepared by consulting engineers, raSmith - 16745 West Bluemound Road, Brookfield, Wisconsin, 53005
Bid Results
Roads / Highways
$223,178.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 27, 2022
June 15, 2022
E St Francis Ave, Saint Francis, WI
Related To This Project
Saint Francis, WI
Bid Date: Jun 15 2022
Saint Francis, WI
--
Saint Francis, WI
--
Saint Francis, WI
--
Saint Francis, WI
--
Saint Francis, WI
--
Saint Francis, WI
--
Saint Francis, WI
--
Saint Francis, WI
Bid Date: Mar 02 2022
Saint Francis, WI
Bid Date: Apr 27 2022
Saint Francis, WI
Bid Date: Apr 24 2019
Saint Francis, WI
--
Saint Francis, WI
Bid Date: Nov 16 2022
Park Falls, WI
Bid Date: May 19 2022
Milwaukee, WI
Bid Date: May 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.