EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 10, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Danville, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

BIDDING & CONTRACT REQUIREMENTS Section 00 11 13 This project consists of work at Vermilion Association for Special Education outside of Danville IL. At VASE, the existing hot-mix asphalt parking lot to the north of the school will be milled and overlay with new hot-mix asphalt pavement; Patching full depth hot-mix asphalt pavement will be implemented in areas of concern after milling. Various items that are included in this project are earth excavation, PCC sidewalk placement, HMA paving, striping, topsoil placement and other appurtenances. Your Bid will be required to be submitted under acondition ofirrevocability for a period of 30 days after submission. The Owner reserves the right to accept orreject any or all Bids or any part thereof, towaive any informality in bidding, and to accept bids deemed most favorable to the Owner. Award of acontract is anticipated to occur on May 4, 2022. Begin construction on June 1, 2022. The Work shall be Substantially Complete: July 29, 2022.

Bid Results

Sidewalks / Parking Lot

$245,247.00

Public - City

Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Sanitary Sewerage
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Subgrade Preparation, Excavation, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Base Courses, Lime-Treated Subgrades, Rigid Paving, Concrete Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
54
Bidding Soon
675
All Active Projects
299
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2022

June 1, 2022

img_map_placeholder

15009 Catlin Tilton Rd, Danville, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2022 Parking Lot Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.