Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2022 at 8:00 PM

Updated October 24, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in Parma, Missouri. Completed plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for paving for a bridge / tunnel.

The project shall consist of: Replace an aging, low-rated bridge with new single span pre-engineered concrete box beam bridge The DBE (Disadvantaged Business Enterprise) contract goals for the amount of work to be awarded for the Stoddard County Road 784 Bridge Replacement, is 5% of the total project price. The Owner must award the project to the lowest responsive, responsible bidder, however the owner may reject all bids. Est. Completion Date: March 31, 2023 Pre-Bid Meeting Info: None Planned

Post-Bid

Bridges / Tunnels

$200,000.00

Public - County

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
40
Bidding Soon
567
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2022

June 15, 2022

Project location map

CR 784, Parma, MO

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed