BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Suffield, Connecticut. Completed plans call for the renovation of a detention facility.

Freezer replacement including floor at CT Department of Correction MacDougall CI. Mandatory pre-bid attendance, all attendees must submit a security clearance form one week prior to pre-bid. • Daily access into the freezer and for security. • Removal of old freezer panels and associated equipment to allow for access of personnel, materials and equipment. • Selectively straight saw cut the heaved CIP concrete slab +/- 5” from freezer wall into 2’ x 2’ cubes & remove to dumpsters (disposal included). • Excavate soils to remove broken defrost piping under the slab & dispose into dumpsters. • Place storm water infiltrator on compacted soils filled with crushed stone & covered with filter fabric • Install drain pipe into infiltrator & stub up. • Drill & pin perimeter of existing concrete with # 5 rebar in preparation for CIP concrete. • Bring in aggregate & bring to subgrade, compact. • Place 4” of rigid insulation on prepared subgrade. • Pour 5” of 4000# air entrained concrete with integral fiber mesh. Pull concrete cylinders for break analysis at Materials Testing Lab Inc. Results/reports to be provided to customer at end of project. • Ensure floor drain & Rectorseal trap sealer is installed. • Pitch concrete to drain. • Two-day cure & return to shot blast or grind fresh concrete to accept Dur-A-Flex Polycrete MDB floor system with an integral 6” cove base and topcoat in any standard color offered by Dur-A-Flex. Total thickness of ¼” for special flooring • Cure & place. • Install a new freezer unit complete with all associated equipment comparable to or to exceed the existing freezer unit in place currently. • Remove temporary door & relay masonry to close up opening. • CMU is by Westbrook Block Co – natural grey with natural grey mortar – Econo-Brick close possible match • General broom clean of work area & demobilize. • All specification and warranty documents to be submitted to DOC. at the beginning of the project

Post-Bid

Jails / Prisons

$120,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
385
Active Projects
178
Bidding Soon
3,377
All Active Projects
1,450
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2022

June 13, 2022

img_map_placeholder

1153 East Street S, Suffield, CT

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.