BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a playground / park / athletic field in Mission Viejo, California. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

As of June 23, 2022. This project has not yet been awarded. A timeline for award has not yet been established. Furnishing all materials, equipment, tools, labor and incidentals as required for the above-stated project in strict accordance with the specifications and drawings on file at the office of the City Clerk of the City of Mission Viejo. The Work to be constructed under the Contract is located in the City of Mission Viejo. The Work to be performed consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above-stated Contract. The general items of Work to be done hereunder consist of: Construction and installation of ballfield lighting; provide and install all related electrical components and ancillary work. Engineer's Estimated Cost: $1 to $1,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Pre-Qualification for Bidders: Required Bid Bond Percentage: 10% The Agency reserves the right, after opening bids, to reject any or all bids, or to make award to the lowest responsive and responsible bidder and reject all other bids; to waive any informality in the bidding; and to take all bids under advisement for a period of 90 days. Bids will be compared on the basis of the Engineer's estimate of the quantities of the several items of Work as shown on all Bid Sheets. Only such plans, specifications, and items of work as are appropriate shall apply to the Work as bid The Performance and Payment Bonds shall be submitted before execution of the Contract. The Performance Bond shall be not less than 100% of the total amount of the bid price named in the Contract. The Payment Bond shall be not less than 100% of the total amount of the bid price named in the Contract.

Bid Results

Playgrounds / Parks / Athletic Fields

$482,500.00

Public - City

Outdoor Lighting, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
139
Bidding Soon
2,397
All Active Projects
1,104
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2022

June 16, 2022

img_map_placeholder

22056 Olympiad Rd, Mission Viejo, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.