BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Carlyle, Illinois. Contact the soliciting agency for additional information.

Contractor shall supply all equipment, labor, and materials used for the installation of new water lines in Dam East Recreation Area. The contractor shall trench, install & backfill approximately 2150 linear feet of 3" SDR21 pipe, 150 linear feet of 1" HDPE pipe, 2 3" MJ Gate Valves, 2 valve boxes, 11 1" CTS curb stops, 11 curb boxes, and 11 Woodford S3-2 yard hydrants. The contractor shall tap into existing 1 1/2 " water line using a saddle & corp and connect all water lines to hydrants and valves as needed. A curb box shall be placed over the new CTS valves and a valve box shall be placed over the new MJ gate valves to provide access to all valves. When complete, the access holes will allow a water wrench to be used to turn the valves on and off. After all lines, valves, and hydrants have been installed, the contractor shall pressure test the complete system to ensure no leaks. All waterlines will be laid with detection wire and "caution water line" locating tape. The waterline trench will have water line locating tape located approximating 18" below finished grade. All installations and connections of the water line and hydrants shall be in accordance with State and local plumbing codes by an IL licensed plumber. Water line field locations will be field located by the Government. All materials for water line installation and associated connections shall be furnished by the contractor. Installation shall be all inclusive to include all cost for parts, pipe, hydrants, materials, trenching, backfill, marking tape, detection wire, labor, supervision, equipment, testing, and incidentals required to install water lines per linear foot. Installation of new water lines will require contractor to trench through two roadways. The contractor is responsible for backfilling and repairing roadways with asphalt material after completion of installation. The contractor is responsible for locating any and all public, private and/or Government owned utilities prior to commencing work. Any damage to any utilities caused by the Contractor's operations shall be replaced by the contractor at no expense to the Government. Remit questions to Elena.C.Coleman@USACE.ARMY.MIL Site visit is scheduled April 19th at 9:00 a.m. 801 Lake Carlyle, IL 62231. POC is Jody Harris. Questions deadline is 4/20/22 at10:00 a.m. Central. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$100,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
42
Bidding Soon
743
All Active Projects
288
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2022

April 28, 2022

img_map_placeholder

801 W Lake Terrace, Carlyle, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.