BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Sault Sainte Marie, Michigan. Completed plans call for the renovation of a educational facility.

As of June 30, 2022. The project has been awarded to Builders First Source amounting $45,434.06 Work shall include but not be limited to: a. Installation of 7,388 square feet of floor tile, base molding, adhesives, underlayment, and trim accessories on the second floor of the high school, as marked with an (X) in attached diagram. b. removal of the existing carpeting and base molding c. warranty the installation for a period of not less than two years from date of acceptance. Site will be available after June 3,2022. Sequencing of work will be coordinated between the Owner and the contractor. The building staff will be responsible for the removal of furniture and fixtures that are in the work area. Sault Ste Marie Area Public Schools is requesting bids for the removal of carpeting and tile installation at Sault Area High School according to the enclosed specifications and instructions. This project is being federally funded and must adhere to prevailing wage rates. Questions regarding the specifications should be directed to Tom Nelson, Maintenance Director. Tom can be reached via e-mail at nelsont@eupschools.org or phone at 906-635- 3839 x-5651. Sault Ste. Marie Area Public Schools Board of Education (the Board) reserves the right to accept or reject any or all bids. The Board reserves the right to waive any informalities or irregularities in any or all bids and to make such award as it deems, in its sole discretion, to be in the best interest of the district

Award

Educational

$45,434.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
6
Bidding Soon
58
All Active Projects
20
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2022

June 2, 2022

img_map_placeholder

904 Marquette Ave, Sault Sainte Marie, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sault Area High School Flooring

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.