BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Adair, Oklahoma. Completed plans call for site work for a educational facility; and playground / park / athletic field.

Each Proposal shall be accompanied by a Bid Bond, or a cashier's check for 5% of the Bid Amount.TIME OF COMPLETION AND LIQUIDATED DAMAGE Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work By August 10th, 2022 of Liquidated damages will apply after acknowledging contract day extensions given to bidder due to weather or other contractually recognized extensions.The successful respondent must provide Bonds to cover the following, Payment, Performance and Maintenance each for the full amount of the contract. The whole work under this contract will be awarded as a single contract to the lowest and best responsible bidder pursuant to the requirements and instructions of the issued Request for Proposal. No bid may be withdrawn for a period of thirty days after bid opening. Specifications and Project Parameters contained in the Request for Proposal (RFP) may be obtained at the office of the Adair School Superintendent, Adair, Oklahoma. Adair Public Schools reserves the right to reject all any or all bids associated with this RFP if they are in non-compliance with the RFP. Estimated cost is under $1,000,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Playgrounds / Parks / Athletic Fields

$964,375.00

Public - City

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
62
Bidding Soon
814
All Active Projects
355
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2022

May 15, 2022

img_map_placeholder

101 Harley Hughes Ave, Adair, OK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.