BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Montpelier, Ohio. Completed plans call for the renovation of a water / sewer project.

Remove and replace existing wood decking with a composite decking material (e.g., Trex or TimberTech) for a 30.5 feet x 8 feet floating dock. o Remove and reuse all rubber bumper material o Remove and reuse any existing boat cleats o dispose of all existing decking material o Fasten treated pine boards to steel frame the length of dock to act as a fastening platform (see Figure 2). o Attach composite decking to the treated lumber using fasteners approved by manufacturer (decking should be fastened to lay perpendicular to the edge of the dock) o Decking Color should be a Gray hue or as close as possible Delivery Date: Work must be completed by June 30, 2022 Liquidated Damages. If actual and direct damages are uncertain or difficult to determine, the State may recover liquidated damages. Unless otherwise specified, liquidated damages will be in the amount of 1% of the value of the order, Deliverable, or milestone that are the subject of the default, for every day that the default is not cured by the Contractor. The State recognizes that it may be necessary for the Contractor to use a subcontractor to perform a portion of the work under the Contract. In those circumstances, the Contractor shall submit a list identifying the Contractor's subcontractors. The Contractor may not enter into subcontracts related to the Contract after award without written approval from the State. If any change occurs during the term of the Contract, that requires a change to identified subcontractors, the Contractor shall amend its list of subcontractors and request written approval from the State. The State reserves the right to reject any subcontractor submitted by the Contractor.

Post-Bid

Water / Sewer

$100,000.00

Public - State/Provincial

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
94
Bidding Soon
1,140
All Active Projects
527
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2022

May 27, 2022

img_map_placeholder

To Be Determined, Montpelier, OH


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.