Published June 2, 2022 at 8:00 PM
Updated September 14, 2023
Remodeling and renovation of a military facility in Bremerton, Washington. Completed plans call for the remodel of a military facility.
Design, Supply and Install a permanent Reverse Osmosis water treatment system capable of supplying water at a rate of 60GPM. Option items to include second RO system that is to be skid-mounted and designed to be "cleanable in place". flow rate is to be the same as permanently mounted system. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com. *This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff at contentcase@constructconnect.com. This is a design-build contract. The work includes design and construction activities necessary to provide a dedicated reverse osmosis (RO) system, skid and pretreatment accessories, properly outfitted and sized to meet the needs and demands of the Pure Water production system with a permeate flow rate of approximately 60 gpm, and incidental related work. There exists an optional item to provide a single movable, skidmounted clean-in-place (CIP) system. Provide and install a new, dedicated reverse osmosis system, skid and pretreatment accessories, which will be located on the north side of the Pure Water Room on the fifth floor of Building 900. Contractor and Designers shall determine the optimal points of connection and piping header interface points for the new, dedicated reverse osmosis system, including electrical power, incoming water supply to the new RO (fresh water), outgoing RO water to existing pure water feed piping (permeate), outgoing RO waste water to the deionized waste water header (concentrate) and chemical cleaning waste water header. The proposed site location and anticipated system tie-in points are shown in Part 6, Enclosure 5 (Proposed Location Drawing with Points of Connection). Contractor provides the new locally mounted controllers, new remote controller/monitor with interconnecting signal cabling, and all programming on the new system. Contractor shall run signal cable for connection between local control panel at the RO Unit 5th floor and the remote control panel located in the Pure Water Plant on the 1st floor. Contractor should run signal cable and provide remote RO HMI adjacent to existing PLC in Pure Water plant, but will make no connections to existing system. Provide all new stainless steel piping, valves, gauges, indicators, controls, and accessories necessary to connect the new RO system, including pretreatment, to feed the 5 th floor degasifier tower.
Post-Bid
Military
$1,000,000.00
Public - Federal
Remodeling, Renovation
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 04 - Masonry
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 2, 2022
May 30, 2022

1400 Farragut St., Bremerton, WA
Related To This Project
Bremerton, WA
Bid Date: May 11 2022
Bremerton, WA
Bid Date: Jun 09 2022
Bremerton, WA
Bid Date: Jun 08 2022
Bremerton, WA
Bid Date: Jun 30 2022
Bremerton, WA
Bid Date: Jun 14 2022
Bremerton, WA
Bid Date: May 11 2022
Bremerton, WA
Bid Date: Aug 24 2023
Bremerton, WA
Bid Date: May 31 2022
Bremerton, WA
--
Bremerton, WA
Bid Date: May 17 2022
Bremerton, WA
Bid Date: May 23 2022
Bremerton, WA
Bid Date: May 10 2022
Bremerton, WA
Bid Date: Mar 15 2022
Bremerton, WA
Bid Date: Mar 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.