EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 2, 2022 at 8:00 PM

Updated September 14, 2023

Remodeling and renovation of a military facility in Bremerton, Washington. Completed plans call for the remodel of a military facility.

Design, Supply and Install a permanent Reverse Osmosis water treatment system capable of supplying water at a rate of 60GPM. Option items to include second RO system that is to be skid-mounted and designed to be "cleanable in place". flow rate is to be the same as permanently mounted system. *The bid list for this project may be incomplete. If you have been invited to bid on this project by the owner, please notify our editorial staff at contentcase@constructconnect.com. *This project is being bid by invitation only. If you have been contacted by the owner to bid on this project as a general contractor, and would like to be listed below, please notify our editorial staff at contentcase@constructconnect.com. This is a design-build contract. The work includes design and construction activities necessary to provide a dedicated reverse osmosis (RO) system, skid and pretreatment accessories, properly outfitted and sized to meet the needs and demands of the Pure Water production system with a permeate flow rate of approximately 60 gpm, and incidental related work. There exists an optional item to provide a single movable, skidmounted clean-in-place (CIP) system. Provide and install a new, dedicated reverse osmosis system, skid and pretreatment accessories, which will be located on the north side of the Pure Water Room on the fifth floor of Building 900. Contractor and Designers shall determine the optimal points of connection and piping header interface points for the new, dedicated reverse osmosis system, including electrical power, incoming water supply to the new RO (fresh water), outgoing RO water to existing pure water feed piping (permeate), outgoing RO waste water to the deionized waste water header (concentrate) and chemical cleaning waste water header. The proposed site location and anticipated system tie-in points are shown in Part 6, Enclosure 5 (Proposed Location Drawing with Points of Connection). Contractor provides the new locally mounted controllers, new remote controller/monitor with interconnecting signal cabling, and all programming on the new system. Contractor shall run signal cable for connection between local control panel at the RO Unit 5th floor and the remote control panel located in the Pure Water Plant on the 1st floor. Contractor should run signal cable and provide remote RO HMI adjacent to existing PLC in Pure Water plant, but will make no connections to existing system. Provide all new stainless steel piping, valves, gauges, indicators, controls, and accessories necessary to connect the new RO system, including pretreatment, to feed the 5 th floor degasifier tower.

Post-Bid

Military

$1,000,000.00

Public - Federal

Remodeling, Renovation

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Environmental Controls, Execution and Closeout Requirements, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation, Polychlorinate Biphenyl Remediation
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Windows, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers, Collection and Disposal Equipment, Solid Waste Handling Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Furnishing Accessories, Waste Receptacles
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Circuit Protective Devices, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Transfer Switches, Automatic Transfer Switches, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Hooks, Lifts, Mobile Plant Equipment, Mobile Earth Moving Equipment, Bulldozers, Excavators, Graders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Packaged Water Treatment, Packaged Water Treatment Plants

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
39
Bidding Soon
1,058
All Active Projects
389
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2022

May 30, 2022

img_map_placeholder

1400 Farragut St., Bremerton, WA


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

NAVFAC Dedicated Reverse Osmosis System

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.