Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 17, 2025 at 8:00 PM
Updated March 18, 2025
Site work and paving for a mixed-use development in Mesa, Arizona. Completed plans call for site work for a 3,339-square-foot road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
Destination at Gateway (Berge) Offsite Paving and Utilities Signal Butte Road & Underwood Road Is Located Near the Intersection of Signal Butte Road and Williams Field Road as Outlined in the Improvement Plans for Signal Butte Road. Improvements Will Include Approximately 2,100 Lf of Arterial Roadway Improvements and 750 Lf of Collector Road Improvements Including Asphalt Pavement, Concrete Curbing, Concrete Sidewalk, Concrete Medians, Landscaping, Catch Basins, and Associated Storm Drain Features. Utility Improvements Include Approximately 3,339 Lf of 24” Dip Waterline, 1,170 Lf of 12” Dip Waterline, 1,749 Lf of 10” Pvc Sewer Line, and 1,170 Lf of 8” Pvc Sewer Line. See Bid Schedule for the Full Itemized List of Quantities. Payment and Performance Bonds will be required for this Work. The successful bidder, simultaneously with the execution of the Contract, shall be required to furnish a Payment Bond in the amount equal to one hundred percent (100%) of the Contract Price, and a Performance Bond in an amount equal to one hundred percent (100%) of the Contract Price. The successful bidder shall name BCB Group Investments, LLC as obligee on both the Payment and Performance Bonds and name the City of Mesa as an additional obligee on the Performance Bond using a Dual Obligee Rider form. An approved Dual Obligee Rider Form is included in Chapter 2. The right is hereby reserved to accept or reject any or all bids or parts thereto, to waive any informalities in any proposal and reject the bids of any persons who have been delinquent or unfaithful to any contract with BCB Group Investments, LLC, or the City of Mesa. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions shall be directed to: Stephanie Delgado (City of Mesa), no later than February 14th, 2025 by 5:00 p.m Contact Information: City of Mesa Attn: Stephanie Delgado P.O. Box 1466 Mesa, AZ 85211-1466 stephanie.delgado@mesaaz.gov 480-644-2526
Bid Results
Roads / Highways
$7,702,254.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2025
April 7, 2025
S Signal Butte Rd & Williams Fld Rd, Mesa, AZ
Related To This Project
Mesa, AZ
Bid Date: Jul 20 2022
Mesa, AZ
Bid Date: Aug 17 2022
Mesa, AZ
Bid Date: Jul 25 2022
Mesa, AZ
Bid Date: Aug 18 2022
Mesa, AZ
Bid Date: Jun 30 2022
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
Bid Date: Jan 05 2023
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
--
Mesa, AZ
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
