BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Austin, Texas. Completed plans call for site work for a water / sewer project.

The work generally consists of installation of temporary effluent management, removal of the existing liner, and installing a new 152,000 square foot liner for existing effluent pond. Bids must be accompanied by a bid bond with Power of Attorney attached or cashier's check of five percent (5%) of the total amount bid (sum of all bid items) made payable to Senna Hills M.U.D. Bidders should read and understand all terms and conditions contained in the Contract Documents. Contract Time is of the essence and all Work shall be substantially completed within 90 calendar days after the Notice to Proceed. Liquidated damages are $500 per calendar day. A Bid which, in the opinion of OWNER's staff, deviates from the Contract Documents, and which has not been clarified through a written Addendum prior to Bid submittal deadline, shall be considered an exception to the Contract Documents and grounds for the Bid to be rejected. Owner reserves the right to reject any or all Bids and to waive any informalities and irregularities in Bids received. OWNER reserves the right to reject any or all Bids and to waive any informalities and irregularities in Bids received. The deadline to ask questions is 4/27/2022 11:50 PM CDT The project shall consists of the following: - Diverting effluent delivery to the pond at the wastewater treatment plant, add temporary holding tanks and temporary pumping to effluent irrigation system. - Removal and disposal of existing pond liner. - Earthwork and grading of existing pond slopes/bowl, to establish smooth side slopes. - Installation of new geotextile fabric and liner. - Removal and replacement of rescue ropes. - All other work and materials shown on the drawings and/or specifications or as otherwise described to provide a satisfactory effluent pond liner. This work is to be done in coordination with the ongoing operations and maintenance of the Inframark Water and Infrastructure Services and effluent irrigation of Senna Hills M.U.D., which must be kept in operation and secure from intruder access. No disruptions to the operations of the Treatment Plant or Effluent Pond will be allowed.

Award

Water / Sewer

$1,149,423.00

Public - City

Site Work

78

15

2

5

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
38
Bidding Soon
2,468
All Active Projects
958
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.