Renovation of a detention facility in Pampa, Texas. Completed plans call for the renovation of a detention facility.

Question Deadline: November 3, 2022 at 03:00 PM. The Anticipated Release Date of TDCJ Answer is Thursday November 4, 2022 SCOPE OF WORK A. Follow all Safety Procedures and TDCJ Risk Management Procedures to include the National Electrical Code, NFPA 70E and Life Safety Code. B. Remove all fencing from Service Entrance Transformer Pad No. 5 and extend the existing Concrete Slab to allow for the installation of a New 150 Amp Fused Safety Disconnect, a New Automatic Transfer Switch and a New 100 KW Diesel Generator. C. Install a New 150 Amp Fused Safety Disconnect, a New Automatic Transfer Switch, and a New 100 KW Diesel Generator with all required conductors, conduit, connections and equipment grounding. D. Install 4 - #2/0 THWN-2, 1 - #4 Ground in a 2" Conduit between the T9 Service Transformer to the New 150 Amp 480/277 V 3 Phase 4 Wire Fused Safety Disconnect. E. Install 4 - #2/0 THWN-2, 1 - #4 Ground in a 2" Conduit between the New 150 Amp 480/277 V 3 Phase 4 Wire Fused Safety Disconnect and the New Automatic Transfer Switch. F. Install 4 - #2/0 THWN-2, 1 - #4 Ground in a 2" Conduit between the New 100 KW Diesel Generator to the New Automatic Transfer Switch. G. Install 4 - #2/0 THWN-2, 1 - #4 Ground in a 2" Conduit between the New Automatic Transfer Switch to the existing Underground Conduit at the New Pull Box that was installed between the existing Underground and the HK Panel in the upstairs Gym. H. Locate and excavate the existing underground from the Transformer Pad No. 5 to the HK Panel in the upstairs Gym Electrical Room and install a New Pull Box to route the New Underground from the New Pull Box to the ATS. Abandon the existing underground and conductors from the New Pull Box to the Service Transformer. I. Install new fencing and double door gate on to the existing fence and single door gate. J. Test and commission the entire installation.

Post-Bid

Jails / Prisons

$400,000.00

Public - State/Provincial

Renovation

6

6

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Manufacturing Equipment, Dies and Molds, Dies

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
0
Bidding Soon
105
All Active Projects
40
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2022

December 16, 2022

img_map_placeholder

1992 Helton Rd, Pampa, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.