Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a swimming pool in Fair Oaks, California. Completed plans call for site work for a swimming pool.
The Project includes but is not limited to: Providing a skim coat of Fiberglass, resin, and a Wax Coat finish over the entire surface of the Lap Pool. Removing the existing lap pool surface by sanding, grinding, and pressure washing. Draining and filling lap pool with water (estimated 137,249 Gallons) at Bella Vista High School. Any questions concerning this Invitation To Bid are due no later than April 20, 2022 at 10:00 am and should be directed by email to: SJUSD Facilities Business Department, Maria Mahon, maria.mahon@saniuan.edu and Kyle Morse, kmorse@kitchell.com The successful Bidder shall be required to pay its workers on this Project a sum not less than the general prevailing rate of per diem wages and not less than the general prevailing rate for holiday and overtime work for work of a similar character in the locality in which the Project is performed, as provided under California Labor Code sections 1720 through 1861. Every Bid shall set forth information on subcontractors required by California Public Contract Code sections 4100 to 4114, inclusive. Failure to list a subcontractor for a portion of work, if required, is a representation that the Bidder will perform that portion of work itself. It shall be the responsibility of each prospective Bidder, upon discovery of any ambiguity or discrepancy in the bid form, specifications, or drawings, to bring such ambiguity or discrepancy to the attention of the District prior to the Bid date and time. Failure to raise any such ambiguity or discrepancy prior to the Bid deadline shall waive the Bidder's right to object to the ambiguity or discrepancy after bidding. Bids (pages 1-5 of the Invitation to Bid) shall be completed and submitted in a sealed envelope. On the face of the envelope, clearly write "Bid Proposal - Do Not Open" and indicate the Contractor's Name and Address and Bid Package # and Description. Failure to fully complete and submit all pages of the Bid Form may result in the Bid being rejected as non-responsive. By submitting a bid, and in compliance with the Invitation to Bid, the Bidder agrees to furnish all labor, material, equipment, transportation, tax (including sales and use tax) and services for the work described in the Bid Documents for the price specified. All costs for Bid Bonds, Labor and Material (Payment) Bonds and Performance Bonds shall be included in the Bid price. Attendance for duration of meeting is mandatory and each prime contract bidder (hereinafter referred to as "Bidder" or "Bidders") shall be required to certify, as part of its Proposal Form, that it attended the entirety of the Pre-Bid conference. Failure to include the certification will render the bid nonresponsive. For all Pre-Bid Visits (other than the Pre-bid conference), Bidder must make an appointment with the school prior to visiting the site. With its Bid, the Bidder must submit a Cashier s Check, Certified Check or Bid Bond for ten percent (10%) of the total amount of the bid, made payable to the San Juan Unified School District. Failure to submit required bid security will result in the Bid being rejected as non-responsive. Bids will be opened publicly and read aloud at the time and date established above. Bids shall not expire for 30 days after the Bid due date. If awarded, the Contract will be awarded to the lowest responsive, responsible Bidder. The District reserves the right to waive any irregularity in any Bid and reserves the right to reject all Bids. The successful Bidder will be notified via Notice of Intent to Award and shall submit a Labor and Material (Payment) Bond and Performance Bond, each in the amount of 100% of the Contract Price, prior to issuance of the Notice to Proceed. Any Bidder may file a protest against the award of the Contract to any other Bidder. The protest must be in writing, filed within five (5) calendar days after the opening of bids, and must set forth all grounds for the protest. Untimely protests and/or grounds not set forth in the protest will not be considered. Failure to comply with these protest requirements waives the right to challenge the bidding process or the award in any administrative or judicial tribunal and forever bars the Bidder from bringing such a challenge. The District will provide a written response to any timely bid protest. 1. Furnish and install all labor, material and equipment for all Work shown and/or specifiedin accordance with the Contract Documents, except as excludedbelow. 2. Information provided under "Also Included" points out some items which may be considered less obvious or "unconventional", but which are included in the Scope of Work. 3. This Bid Package Description is intended to clarify scope to the Contractor but is inno way intended to limit scope that is reasonable inferable as being required by the Work included in this description. Work required under a Bid Package may be shown or specified anywhere in the Contract Documents.
Award
Swimming Pools
$70,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 26, 2022
May 26, 2022
8301 Madison Ave, Fair Oaks, CA
Related To This Project
Fair Oaks, CA
Bid Date: May 16 2022
Fair Oaks, CA
--
Fair Oaks, CA
--
Fair Oaks, CA
--
Fair Oaks, CA
--
Fair Oaks, CA
--
Fair Oaks, CA
Bid Date: Apr 21 2022
Fair Oaks, CA
Bid Date: Apr 12 2022
Fair Oaks, CA
Bid Date: Apr 12 2022
Fair Oaks, CA
Bid Date: Dec 01 2022
San Bernardino, CA
Bid Date: May 26 2022
Redondo Beach, CA
Bid Date: May 18 2022
Turlock, CA
Bid Date: Mar 30 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.