Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 5, 2022 at 8:00 PM
Updated September 14, 2023
Site work and paving for a bridge / tunnel in Kingston, Missouri. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
We understand the proposed bridges will generally be in the vicinity of the existing low water crossings that are anticipated to be replaced as part of the overall mitigation plan for the Little Otter Creek Reservoir project in Caldwell County. The first site is located approximately 6 miles northwest of Braymer, Missouri in Section 8, Township 56 North, Range 26 West in Caldwell County. The proposed structure will cross Flat Creek at Haun's Mill Drive and will replace the existing corrugated metal culverts at that location. We understand the proposed bridge will generally consist of a single span structure with a length of approximately 60 feet. The concrete bridge deck will be supported by steel girders and will have a finished surface elevation of approximately 755.6 feet. The second site is also located approximately 6 miles northwest of Braymer, Missouri on the Section Line between Section 7 and Section 8, Township 56 North, Range 26 West in Caldwell County. The proposed structure will cross Flat Creek at Turkey Road and will replace the existing HDPE culverts at that location. We understand the proposed bridge will generally consist of a single span structure with a length of approximately 80 feet. The concrete bridge deck will be supported by steel girders and will have a finished surface elevation of approximately 759.7 feet. The third site is located approximately 7 miles north of Braymer, Missouri in Section 36, Township 57 North, Range 26 West in Caldwell County. The proposed structure will cross Panther Creek at NE Toledo Road and will replace the existing concrete low water crossing at that location. We understand the proposed bridge will generally consist of a single span structure with a length of approximately 100 feet. The concrete bridge deck will be supported by steel girders and will have a finished surface elevation of approximately 739.3 feet. We understand the proposed bridges will be designed and constructed in accordance with the applicable design standards and construction specifications of the Missouri Highway and Transportation Commission.
Award
Bridges / Tunnels
$2,300,108.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
