BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 5, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a bridge / tunnel in Kingston, Missouri. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

We understand the proposed bridges will generally be in the vicinity of the existing low water crossings that are anticipated to be replaced as part of the overall mitigation plan for the Little Otter Creek Reservoir project in Caldwell County. The first site is located approximately 6 miles northwest of Braymer, Missouri in Section 8, Township 56 North, Range 26 West in Caldwell County. The proposed structure will cross Flat Creek at Haun's Mill Drive and will replace the existing corrugated metal culverts at that location. We understand the proposed bridge will generally consist of a single span structure with a length of approximately 60 feet. The concrete bridge deck will be supported by steel girders and will have a finished surface elevation of approximately 755.6 feet. The second site is also located approximately 6 miles northwest of Braymer, Missouri on the Section Line between Section 7 and Section 8, Township 56 North, Range 26 West in Caldwell County. The proposed structure will cross Flat Creek at Turkey Road and will replace the existing HDPE culverts at that location. We understand the proposed bridge will generally consist of a single span structure with a length of approximately 80 feet. The concrete bridge deck will be supported by steel girders and will have a finished surface elevation of approximately 759.7 feet. The third site is located approximately 7 miles north of Braymer, Missouri in Section 36, Township 57 North, Range 26 West in Caldwell County. The proposed structure will cross Panther Creek at NE Toledo Road and will replace the existing concrete low water crossing at that location. We understand the proposed bridge will generally consist of a single span structure with a length of approximately 100 feet. The concrete bridge deck will be supported by steel girders and will have a finished surface elevation of approximately 739.3 feet. We understand the proposed bridges will be designed and constructed in accordance with the applicable design standards and construction specifications of the Missouri Highway and Transportation Commission.

Award

Bridges / Tunnels

$2,300,108.00

Public - County

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
80
Bidding Soon
1,055
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2022

July 25, 2022

Project location map

To Be Determined, Kingston, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.