BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Happy Valley, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The bid for this project generally includes reconstruction, repair and overlay street improvements for five (5) streets: Proposed work includes the following: Schedule 'A' (SE 157th Avenue) includes the following proposed work: Ø Crack Sealing: 98,742 +/- lineal feet Ø Slurry Sealing: 104,114 +/- square yard Ø Tree Trimming: 1,373 +/- trees Ø Striping: 27 +/- square feet of 12" stop bar, 1,640 +/- lineal feet of 8" white bike lane, 150 +/- lineal feet of 4" white lane line, 1,566 +/- lineal feet of 4" double yellow center line, 4 (four) bike lane symbols and arrows, 2 (two) turn arrows, Ø ADA Ramp Construction: Removal and construction of 4 (four) ramps Schedule 'B' (SE Isaac Drive) includes the following proposed work: Ø Pavement Grinding 2" Depth: 1,411+/- square yards, Ø Overlay Street to 2" Thickness: 1,411 +/- square yards (160 tons) Ø Speed Bumps: Construction of 2 (two) speed bumps, Ø Striping: 2 +/- speed bumps, 12 +/- square feet of 12" stop bar, and Ø ADA Ramp Construction: Removal and construction of 1 (one) ramp Schedule 'C' (SE Kimberly Court) includes the following proposed work: Ø Pavement Grinding 2" Depth: 2,133 +/- square yards, Ø Overlay Street to 2" Thickness: 2,133 +/- square yards (240 tons), Ø Speed Bump: Construction of 1 (one) speed bump, Ø Striping: 1 +/- speed bump, 10 +/- square feet of 12" bar, and Ø ADA Ramp Construction: Removal and construction of 5 (five) ramps, Schedule 'D' (SE 139th Avenue) includes the following proposed work: Ø Pavement Grinding 2" Depth: 1,150 +/- square yards, Ø Overlay Street to 2" Thickness: 1,150 +/- square yards (128 tons), and Ø ADA Ramp Construction: Removal and construction of 2 (two) ramps Schedule 'E' (SE 140th Place) includes the following proposed work: Ø Pavement Grinding (2"+/-): 238 +/- square yards, Ø Overlay Street to 2" Thickness: 1,058 +/- square yards (118 tons), Ø 3/4"-0 Aggregate Shoulders, 2" Thickness: 27 +/- tons, Ø Striping: 10 +/- square feet of 12" bar Construction must be completed no later than the Friday, August 26, 2022. Once construction on the project has begun, the contractor must reach substantial completion within 60 days of commencing activity. Project and bid documents will be available on Monday, April 18th on the City's website business/engineering-division/bid-adverti sements/ To perform work, bidders must be prequalified with the Oregon Department of Transportation for the class of work defined above. Proof of prequalification must be submitted to the City on the Date of Public Bid Opening. This public works contract is subject to State of Oregon prevailing rates of wage requirements, per ORS 279C.800 through 279C.870. The City will not receive or consider bids unless the bid contains a statement by the bidder that the bidder will comply with ORS 279C.830.Oregon Daily Journal of Commerce Each Bid Proposal shall be accompanied by a certified check, cashier's check or bid bond (with authorized surety company as surety) made payable to the City of Happy Valley for an amount equal to not less than ten percent (10%) of the total amount of the Bid. Engineer's estimate is beteen $625k to $725k *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$632,316.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
61
Bidding Soon
1,076
All Active Projects
400
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2022

June 9, 2022

img_map_placeholder

Multiple Locations, Happy Valley, OR

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.