EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 6, 2022 at 7:00 PM

Updated October 1, 2024

Site work, paving and renovation of a mixed-use development in Nashville, Tennessee. Completed plans call for the renovation of a medical facility; parking garage; for paving for a parking garage; for site work for a sidewalk / parking lot; and sidewalk / parking lot.

Contract Award Date: Nov 17, 2022 Contract Award Number: 36C24923C0019 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: KV1NW9F8M7W6 Contractor Awarded Name: PARAMOUNT CONSTRUCTION GROUP LLC Contractor Awarded Address: RIDGELAND, MS 39157 MSR Base and All Options Value (Total Contract Value): $4792755.00000000 Furnish all labor, material, equipment, and supervision necessary to accomplish the work for Project# 626-21-202 "Elevator & Main Facility Access" at the Tennessee Valley Healthcare System, located at the VA Medical Center, 1310 24th Ave., S., Nashville, TN 37212, as required per specifications and drawings titled "Elevator & Main Facility Access" See: Important Bidders Information starting on Page 6 NAICS Code: 236220 Commercial and Institutional Building Construction Size Standard: $39.5 Set-Aside: 100% Service-Disabled Veteran Owned Small Business (SDVOSB) (see VAAR Clause 852.219-10). Project magnitude is between $2,000,000 and $5,000,000 See FAR 52.236-27 for the date and time of the organized site visit. There will only be one (1) site visit on this project, scheduled for 05/11/2022 at 10:30AM CT. Please make sure you bring any necessary items to properly inspect the site. A face mask must be worn at all times. To obtain clarifications and/or additional information concerning the contract requirement, specifications and/or drawings, submit a written request for information (RFI) via email to michael.brown1305@va.gov. RFIs must be specific in identifying section, paragraph, and page number and must be in question format. All RFIs submitted shall include the project number and title, contractor name, city, state, phone number, date submitted and RFI questions. Questions received after 10:30 AM CT 05/16/2022 will not be answered unless it is determined to be in the best interest of the government. Telephone requests will NOT be accepted. All questions at the site visit MUST BE in writing and submitted as an RFI. This acquisition is 100% set-aside for SDVOSB concerns. To be eligible for award, the contractor must be listed and visible in the Registry at https://www.vetbiz.va.gov/vip/ at the time of offers due and award. Offerors in reverification status are not eligible. In accordance with FAR 52.204-7, all prospective offerors must have an active SAM registration at time of offer and award. The official bid opening will be June 01, 2022 at 13:00PM CT and will occur via Microsoft Teams call in Please call 872-701-0185 Conf. No. 985 798 90# five minutes before the bid opening to be present for the bid opening. Submit one (1) electronic copy of bids with a copy of bid bond via email to michael.brown130@va.gov and one (1) original hard copy bid bond on or before the due date/time stated in Block 13. Bid bond must be received at the following address: Department of Veterans Affairs, Network Contracting office (NCO) 9, Attn: Michael Brown 1639 Medical Center Parkway, Suite 400, Murfreesboro, TN 37129. The contractor shall furnish all labor, material, equipment and supervision necessary to accomplish the work for Project# 626-21- 202 "Elevator & Main Facility Access" at the Tennessee Valley Healthcare System, VA Medical Center, 1310 24th Ave., S., Nashville, TN 37212 in accordance with the specifications and drawings titled "Elevator & Main Facility Access". Work includes demolition/new construction, structural, architectural, mechanical, plumbing, fire protection, electrical, fire alarm, low voltage, life safety, communications, security / access controls, industrial hygiene, and commissioning. Construction shall be complete in 294 calendar days 1.00 JB 236220 Commercial and Institutional Building Construction Z1DA Maintenance of Hospitals and Infirmaries PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z1DA - Maintenance of Hospitals and Infirmaries LOCAL STOCK NUMBER: 626-21-202 Title of Project: Project# 626-21-202 "Elevator & Main Facility Access" Scope of Work: The contractor shall furnish all labor, material, equipment, and supervision necessary to accomplish the work for Project# 626-21-202 "Elevator & Main Facility Access" at the Tennessee Valley Healthcare System, VA Medical Center, 1310 24th Ave., S., Nashville, TN 37212 following the specifications and drawings titled "Elevator & Main Facility Access". Statement of Bid Item(s): Base Bid (All Work): Complete Project 626-21-202, "Elevator & Main Facility Access", in strict accordance with the specifications and drawings at the Tennessee Valley Healthcare System, VAMC, 1310 24th Avenue South, Nashville, TN 37212. Work includes but is not limited to: a) Renovation of pedestrian bridge between parking garage and VA medical facility. b) Reconfigure and renovate a portion of the parking garage to create a patient drop off zone, vestibule, patient seating, restrooms, and a patient help desk. c) Modernize elevators P10 and P11. d) Remove dumbwaiters 7, 8, and 9. e) Testing and certification of all new systems. f) Provide trending for 30 days and verification of the upgraded control systems. Testing, Adjusting and Balancing (TAB) of upgraded HVAC systems to ensure that the HVAC system complies with the VA HVAC Design Manual Standards and specification section 23 05 93. TAB to be complete before final inspection is requested. g) Maintain safe pedestrian/staff/visitor access through the space during the entire construction process. Maintain vehicular traffic and patient drop-off/pickup. h) Provide port-a-potty for contractors. Period of Performance: 294 calendar days from the issuance of the Notice to Proceed to complete the work. GENERAL REQUIREMENTS 1. All work including materials shall be warranted for a minimum of one year, and additional years as identified in specifications. 2. Normal project working hours are Monday thru Friday from 6 a.m. to 2:30 p.m. On-site worktime shall be managed to minimize the effect on the medical center. Normal medical center operations from 5:30 a.m. to 9:30 p.m. Monday through Friday. Weekend and night work will be required to minimize disruption of the medical center, such as pedestrian bridge work overhead and flooring. 3. Portions of work that require shutdowns, excessive noise, or interrupt adjacent service operations will be performed on nights and/or weekends between 6:00 4. p.m. Friday to 5:00 a.m. Monday. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PN - 20-383

Award

Medical

$4,792,755.00

Public - Federal

Paving, Renovation, Site Work

69

30

126

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Project Record Documents, Spare Parts, Demonstration and Training, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Architectural Concrete, Specialty Placed Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Glass Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Heavy Timber Construction, Sheathing, Gypsum Sheathing, Finish Carpentry, Architectural Woodwork, Structural Plastics, Structural Plastic Shapes and Plates, Plastic Lumber
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Steep Slope Roofing, Shingles and Shakes, Wood Shingles, Roofing and Siding Panels, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Smoke Seals, Joint Protection, Preformed Joint Seals, Backer Rods, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Glazing Accessories, Louvers and Vents, Louvers, Operable Wall Louvers, Door Louvers, Vents, Wall Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Gypsum Lath, Metal Lath, Gypsum Plastering, Portland Cement Plastering, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Tile Flooring, Terrazzo Flooring, Fluid-Applied Flooring, Resinous Flooring, Carpeting, Access Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Directories, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Fire Extinguishers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment, Commercial Equipment, Office Equipment, Printers, Foodservice Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools, Tubs and Pools, Therapeutic Pools, Integrated Construction, Radiation Protection
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters, Elevators, Elevator Equipment and Controls, Elevator Equipment
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Suppression Sprinkler Systems, Wet-Pipe Sprinkler Systems
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Terminal Units, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Overcurrent Protective Device Coordination Study, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Grounding and Bonding for Communications Systems, Structured Cabling, Communications Horizontal Cabling, Data Communications, Data Communications Peripheral Data Equipment, Printers, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Conductors and Cables for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Cement and Concrete for Earthwork, Earth Moving, Grading, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
36
Bidding Soon
736
All Active Projects
330
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Upgrade Elevator and Main Facility Access

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.