BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a civil project in Hinsdale, Illinois. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

As of September 20, 2022, a general contractor has already been awarded, and construction has commenced. I-21-4835 Tri-State Tollway (I-294) Roadway and Bridge Reconstruction Northbound I-294/ I-290/I-88 Pursuant to CPO Notice 2020.06, State agencies shall only accept electronic submissions for competitive solicitations. Paper responses will not be accepted. For more details please see the attachment titled Notice of Electronic Submissions Only. Please see attached Volume I for required documents. NORTHBOUND I-294/I-290/I-88 INTERCHANGE ROOSEVELT ROAD TO ST. CHARLES ROAD MILE POST 30.5 TO MILE POST 32.4 The work to be done under this contract shall be started on or about September 19, 2022. All work under this contract shall be completed by December 18, 2024. The location of services to be performed is on the Tri-State Tollway (I-294) northbound between Roosevelt Road and St. Charles Road (Mile Post 30.5 to Mile Post 32.4) The scope of the work shall consist of pavement removal, pavement widening, bridge rehabilitation and construction, bridge removal, retaining wall repairs and construction, noise abatement wall construction, noise abatement wall removal, mechanically stabilized earth retaining wall removal, concrete retaining wall removal, utility protection for 72" and 90" watermain, drainage and utility improvements, Intelligent Transportation System (ITS) infrastructure, temporary and permanent lighting systems, erosion control measures and landscaping improvements, signing, maintenance of traffic operations, and other miscellaneous work. *Addendum #1, #2 and #3 have been posted.

Under Construction

Bridges / Tunnels

$205,907,075.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
117
Bidding Soon
1,800
All Active Projects
809
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2022

September 19, 2022

img_map_placeholder

Multiple Locations, Hinsdale, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.