Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Richmond, California. Contact the soliciting agency for additional information.
The work will be performed at 2910 Hilltop Drive, Richmond, CA 94806 and the intent of this RFP is to procure services from an organization who will safely assess the attic for structural integrity under loading scenarios detailed. Prepare and provide a health and safety plan including COVID-19 mitigation measures, pertinent contacts for incident reporting and directions to and from the site (2910 Hilltop Drive, Richmond CA 94806) as related to the nearest health facility. Provide all necessary materials, supplies, equipment, services and personnel to adequately carry out or complete the Scope of Services. The attic should be reviewed for structural integrity to ensure it can withstand all reasonable and potential loading scenarios including, but not limited to: live loads, seismic loads and environmental loads such as wind. Prior to the assessment, the selected proposer and WCW will discuss loading scenario details. The most recent attic plan sheets have been uploaded as attachments. A plan review table, 2 chairs and thousands of paper documents will be stored in the space full-time. On average, 1 or 2 people will be in the referenced space for 4 hours per month (expected occupancy: 1 hour per day, likely for only 1 day per week). In the most likely maximum loading scenario (i.e. people relocating cabinets full of documents), 4 people could be in the referenced space for 4 hours in 1 day. This assessment should be provided as a report (.pdf) including analysis required by latest version of the California Building Code, BSE-2E assessments, life cycle information before and after proposed work. The following services are optional and may be selected by WCW in its sole discretion. 3.6.1. As-needed Destructive Testing for the Base Scenario Arrange for on-site destructive testing to occur prior to completion of the final deliverable. This includes pulling all necessary permits, removing portions of structures, obtaining samples and testing them for characteristics that could potentially improve the quality of the final deliverable for the base scenario. 3.6.2. Structural Assessment for an Occupied Office Space Scenario The attic should be reviewed for structural integrity to ensure it can withstand the base loading scenario in addition to employee occupancy of the space for 40 hours per week (8 hours per day for 5 days). Prior to the assessment, the selected proposer and WCW will discuss loading scenario details. 3.6.3. As-needed Destructive Testing for an Occupied Office Space Scenario Arrange for on-site destructive testing to occur prior to completion of the final deliverable. This includes pulling all necessary permits, removing portions of structures, obtaining samples and testing them for characteristics that could potentially improve the quality of the final deliverable for the scenario that includes the base scenario and employee occupancy of the space for 40 hours per week (8 hours per day for 5 days). West County Wastewater District ("WCW") is seeking proposals from qualified firm(s) to provide structural integrity services (assessment) for the Hilltop Admin. Bldg. ("Services"), as further detailed in Section 3, Scope of Services. If approved by WCW's Board of Directors, the successful Proposer will execute an agreement in the form of Attachment A for a one (1) year base term with up to four (4) one year option terms. WCW provides wastewater collection and treatment services to approximately 100,000 residents. WCW is a political subdivision of the State of California and operates as an independent special district. WCW's current political boundaries are comprised of the City of San Pablo, a portion of the City of Richmond, a portion of the City of Pinole, and some unincorporated areas within western Contra Costa County. WCW's system includes 249 miles of gravity sewer pipelines, 17 lift stations, 6 miles of pressurized force mains, and a water quality resource recovery plant with a National Pollutant Discharge Elimination System (NPDES) permitted capacity of 12.5 million gallons per day. The method of contractor selection has not been determined at this time.
Conceptual
Municipal
Public - County
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 14, 2023
2910 Hilltop Dr, Richmond, CA
Related To This Project
Richmond, CA
--
Richmond, CA
Bid Date: Jun 18 2021
Richmond, CA
Bid Date: Oct 06 2022
Richmond, CA
Bid Date: Oct 24 2022
Richmond, CA
Bid Date: Nov 16 2022
Richmond, CA
--
Richmond, CA
Bid Date: Nov 24 2020
Richmond, CA
Bid Date: Nov 29 2022
Richmond, CA
Bid Date: Jun 23 2023
Richmond, CA
--
Richmond, CA
--
Richmond, CA
--
San Carlos, CA
Bid Date: Oct 11 2022
Clovis, CA
Bid Date: Oct 04 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.