BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a pipeline in Monroe, Georgia. Completed plans call for site work for a pipeline.

The City of Monroe will be accepting Bids to contract services for the installation and relocation of natural gas mains for the proposed SR 83 Connector bypass project. All submittals should follow instructions as detailed in the Invitation to Bid and be complete in scope as requested by the City of Monroe. Bids will be reviewed and evaluated by staff on the criteria listed herein. At the discretion of the Purchasing Department companies may or may not be contacted for further justification on pricing and details provided in the Bid submittal. Award shall be given to the lowest bid that meets the requirements as listed in this Invitation to Bid, while being both responsive and responsible, with reservation of right to reject any and all bids. We thank you in advance for your submission and welcome any questions you may have during the process. Chris Bailey Assistant City Administrator SCOPE OF SERVICES REQUESTED The following details the scope of services requested for the installation/relocation of steel natural gas main located on Highway 11 South in the area of Mt. Paran Church Road by directional bore or trench cutting. o 600 feet of 2" steel high pressure gas main. o 2,750 feet of 4" steel high pressure gas main. o Pressure test at 300 psi for a period of no less than 24 hours and provide chart recording verifying pressure test completion. o Tie-in of all 3/4 " steel high pressure gas line services to include 5 long side services and 3 short side services. o 2" main tie-ins at existing station 314+25, contractor responsible for control fittings and taps associated. o 4" main tie-ins at existing station 293+60 and existing station 266+50, contractor responsible for control fittings and taps associated. o NOTE: all material will be provided by the City of Monroe. o NOTE: the City of Monroe will relight all gas services upon completion. o NOTE: existing gas main pressure is 150 psi. o NOTE: no bid, performance, or payment bonds required. o NOTE: timeline for completion is not to exceed 60 days. Question Deadline 09/25/2023 at 5:00 PM ET

Post-Bid

Pipeline

$300,000.00

Public - City

Site Work

5

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
97
Bidding Soon
1,517
All Active Projects
662
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2023

October 11, 2023

img_map_placeholder

GA-83, Monroe, GA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.