Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a pipeline in Monroe, Georgia. Completed plans call for site work for a pipeline.
The City of Monroe will be accepting Bids to contract services for the installation and relocation of natural gas mains for the proposed SR 83 Connector bypass project. All submittals should follow instructions as detailed in the Invitation to Bid and be complete in scope as requested by the City of Monroe. Bids will be reviewed and evaluated by staff on the criteria listed herein. At the discretion of the Purchasing Department companies may or may not be contacted for further justification on pricing and details provided in the Bid submittal. Award shall be given to the lowest bid that meets the requirements as listed in this Invitation to Bid, while being both responsive and responsible, with reservation of right to reject any and all bids. We thank you in advance for your submission and welcome any questions you may have during the process. Chris Bailey Assistant City Administrator SCOPE OF SERVICES REQUESTED The following details the scope of services requested for the installation/relocation of steel natural gas main located on Highway 11 South in the area of Mt. Paran Church Road by directional bore or trench cutting. o 600 feet of 2" steel high pressure gas main. o 2,750 feet of 4" steel high pressure gas main. o Pressure test at 300 psi for a period of no less than 24 hours and provide chart recording verifying pressure test completion. o Tie-in of all 3/4 " steel high pressure gas line services to include 5 long side services and 3 short side services. o 2" main tie-ins at existing station 314+25, contractor responsible for control fittings and taps associated. o 4" main tie-ins at existing station 293+60 and existing station 266+50, contractor responsible for control fittings and taps associated. o NOTE: all material will be provided by the City of Monroe. o NOTE: the City of Monroe will relight all gas services upon completion. o NOTE: existing gas main pressure is 150 psi. o NOTE: no bid, performance, or payment bonds required. o NOTE: timeline for completion is not to exceed 60 days. Question Deadline 09/25/2023 at 5:00 PM ET
Post-Bid
Pipeline
$300,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 5, 2023
October 11, 2023
GA-83, Monroe, GA
Related To This Project
Monroe, GA
Bid Date: Jun 30 2022
Monroe, GA
Bid Date: Jul 22 2022
Monroe, GA
Bid Date: Apr 12 2022
Monroe, GA
Bid Date: Jul 11 2022
Monroe, GA
Bid Date: Aug 03 2022
Monroe, GA
Bid Date: Jun 29 2022
Monroe, GA
Bid Date: Jun 28 2022
Monroe, GA
Bid Date: Mar 17 2022
Monroe, GA
Bid Date: Jun 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.